HomeMy Public PortalAbout11806O R D I N A N C E NO. 11806
AN ORDINANCE, appropriating Four Hundred Eight
Thousand Dollars ($408,000.00) from the Sanitary Replacement Fund for
engineering services for the final design of Gravois Trunk (Whitecliff to
RDP) Sanitary Relief Phase II (90032A); and authorizing the Executive
Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis
Sewer District to enter into Contract E-1099 with EDM Inc., for the
aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is
an unencumbered balance in the above-named fund sufficient to pay the
obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Four Hundred Eight Thousand
Dollars ($408,000.00) is hereby appropriated from the Sanitary
Replacement Fund for engineering services for the final design of Gravois
Trunk (Whitecliff to RDP) Sanitary Relief Phase II (90032A).
Section Two. The Executive Director and Secretary-
Treasurer are hereby authorized on behalf of The Metropolitan St. Louis
Sewer District to enter into Contract E-1099 with EDM Inc., for
engineering services for the final design of Gravois Trunk (Whitecliff to
RDP) Sanitary Relief Phase II (90032A); said contract to be comprised of
such terms and conditions as are approved by the office of the General
Counsel of the District.
Section Three. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted August 12, 2004.