Loading...
HomeMy Public PortalAbout11832O R D I N A N C E NO. 11832 AN ORDINANCE, appropriating Seven Hundred Twenty Thousand Dollars ($720,000.00) from the Operation, Maintenance and Construction Improvement Fund of Lower Meramec River Basin for engineering services for the final design of Brookton Way to Meramec Bottom Road Sanitary Relief (2000083); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E- 1104 with Kuhlmann Design Group Inc., for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Seven Hundred Twenty Thousand Dollars ($720,000.00) is hereby appropriated from the Operation, Maintenance and Construction Improvement Fund of Lower Meramec River Basin for engineering services for the final design of Brookton Way to Meramec Bottom Road Sanitary Relief (2000083). Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1104 with Kuhlmann Design Group Inc., for engineering services for the final design of Brookton Way to Meramec Bottom Road Sanitary Relief (2000083); said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted September 9, 2004.