Loading...
HomeMy Public PortalAbout11843O R D I N A N C E NO. 11843 AN ORDINANCE, appropriating One Million Three Hundred Twenty-five Thousand Dollars ($1,325,000.00) from the Sanitary Replacement Fund for engineering services for the preliminary design of Chambers – South Benton Combined Sewer System (2003102), Dakota Combined Sewer System (2003104), Louisa Combined Sewer System (2003109); and authorizing the Executive Director and Secretary- Treasurer to enter into Contract E-1115 with CH2M Hill, Inc., for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of One Million Three Hundred Twenty-five Thousand Dollars ($1,325,000.00) is hereby appropriated from the Sanitary Replacement Fund for engineering services for the preliminary design of Chambers – South Benton Combined Sewer System (2003102), Dakota Combined Sewer System (2003104), Louisa Combined Sewer System (2003109). Section Two. The Executive Director and Secretary- Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1115 with CH2M Hill, Inc. for engineering services for the preliminary design of Chambers – South Benton Combined Sewer System (2003102), Dakota Combined Sewer System (2003104), Louisa Combined Sewer System (2003109); said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. The ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted September 9, 2004.