HomeMy Public PortalAbout11865O R D I N A N C E NO. 11865 AN ORDINANCE, appropriating Four Hundred Fifty-one Thousand
Dollars ($451,000.00) from the Operation, Maintenance and Construction
Improvement Fund of Maline Creek for engineering services for the final design of
Hallstead Storm Channel Phase IV (MCBJ-230)(2002035); and authorizing the
Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis
Sewer District to enter into Contract E-1117 with Reitz & Jens, Inc. for the
aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Four Hundred Fifty-one Thousand Dollars
($451,000.00) is hereby appropriated from the Operation, Maintenance and
Construction Improvement Fund of Maline Creek for engineering services for the
final design of Hallstead Storm Channel Phase IV (MCBJ-230)(2002035),
Section Two. The Executive Director and Secretary-Treasurer are
hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract E-1117 with Reitz & Jens, Inc. for engineering services for the final
design of Hallstead Storm Channel Phase IV (MCBJ-230)(2002035); said contract to
be comprised of such terms and conditions as are approved by the office of the
General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance, shall
take effect immediately upon its enactment.
The foregoing Ordinance was adopted October 14, 2004.