HomeMy Public PortalAbout11869O R D I N A N C E NO. 11869 AN ORDINANCE, appropriating Three Hundred Sixty-eight Thousand
Dollars ($368,000.00) from the Operation, Maintenance and Construction
Improvement Fund of Coldwater Creek for engineering services for the final design
of Flamingo Park Channel Replacement (CLD-14)(2001116); and authorizing the
Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis
Sewer District to enter into Contract E-1122 with SAIC Engineering, Inc. for the
aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Three Hundred Sixty-eight Thousand Dollars
($368,000.00) is hereby appropriated from the Operation, Maintenance and
Construction Improvement Fund of Coldwater Creek for engineering services for
the final design of Flamingo Park Channel Replacement (CLD-14)(2001116).
Section Two. The Executive Director and Secretary-Treasurer are
hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract E-1122 with SAIC Engineering, Inc. for engineering services for the
final design of Flamingo Park Channel Replacement (CLD-14)(2001116); said
contract to be comprised of such terms and conditions as are approved by the office
of the General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance, shall
take effect immediately upon its enactment.
The foregoing Ordinance was adopted October 14, 2004.