HomeMy Public PortalAbout11880O R D I N A N C E NO. 11880 AN ORDINANCE, appropriating Seven Hundred Thousand
Dollars ($700,000.00) from the Sanitary Replacement Fund to be used for
project costs for the construction of Harlem-Baden Relief Phase III
(Broadway)(2001136), in the City of St. Louis, Missouri; and authorizing the
Executive Director and Secretary-Treasurer on behalf of The Metropolitan St.
Louis Sewer District to enter into a contract with Schuster Engineering, Inc.
for the aforesaid construction.
WHEREAS, the bid for the aforesaid construction is Six
Hundred Sixty-one Thousand Seven Hundred Thirty-six Dollars
($661,736.00), and the allowance for construction change orders is Thirty-
eight Thousand Two Hundred Sixty-four Dollars ($38,264.00), and
WHEREAS, the Director of Finance has certified that there is
an unencumbered balance in the above-named fund sufficient to pay the
obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Seven Hundred Thousand
($700,000.00) is hereby appropriated from the Sanitary Replacement Fund to
be used for project costs for the construction of Harlem-Baden Relief Phase
III (Broadway)(2001136), in the City of St. Louis, Missouri.
Section Two. The Executive Director and Secretary-Treasurer
are hereby authorized on behalf of The Metropolitan St. Louis Sewer District
to enter into a contract with Schuster Engineering, Inc. as the lowest
responsible bidder for the construction of Harlem-Baden Relief Phase III
(Broadway)(2001136), in the City of St. Louis, Missouri, pursuant to bids
received and opened on the 14th day of September 2004.
Section Three. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted November 10, 2004.