HomeMy Public PortalAbout11938O R D I N A N C E NO. 11938 AN ORDINANCE, appropriating One Hundred Forty-eight Thousand
Dollars ($148,000.00) from the Sanitary Replacement Fund for engineering services
for the final design of CSO – Interceptor Access and Monitoring Improvements
(I-073B, I-085, I-218, I-230, I-252, I-273B, I-275 and I-285)(2003054-01), and
authorizing the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into Contract E-1128 with Fru-Con
Engineering, Inc. for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of One Hundred Forty-eight Thousand Dollars
($148,000.00) is hereby appropriated from the Sanitary Replacement Fund for
engineering services for the final design of CSO – Interceptor Access and
Monitoring Improvements (I-073B, I-085, I-218, I-230, I-252, I-273B, 1-275 and
I-285)(2003054-01).
Section Two. The Executive Director and Secretary-Treasurer are
hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract E-1128 with Fru-Con Engineering, Inc. for engineering services for
the final design of CSO – Interceptor Access and Monitoring Improvements (I-073B,
I-085, I-218, I-230, I-252, I-273B, I-275 and I-285)(2003054-01); said contract to be
comprised of such terms and conditions as are approved by the office of the General
Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance, shall
take effect immediately upon its enactment.
The foregoing Ordinance was adopted February 10, 2005.