HomeMy Public PortalAbout11945O R D I N A N C E NO. 11945 AN ORDINANCE, making a supplemental appropriation of Five
Hundred Thousand Dollars ($500,000.00) from the Sanitary Replacement Fund for
additional engineering services for the final design of Lower Meramec River
Wastewater System Improvements Baumgartner Interceptor Tunnel and Lift
Station (95066B); and authorizing the Executive Director and Secretary-Treasurer
on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No.
9 of Contract E-898 with Horner and Shifrin, Inc., for the aforesaid additional
engineering services.
WHEREAS, Ordinance No. 10460, adopted November 12, 1998,
appropriated the initial funding for and authorized Contract E-898, and
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Five Hundred Thousand Dollars
($500,000.00) is hereby appropriated from the Sanitary Replacement Fund for
additional engineering services for the final design of Lower Meramec River
Wastewater System Improvements Baumgartner Interceptor Tunnel and Lift
Station (95066B).
Section Two. The Executive Director and Secretary-Treasurer are
hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter
into Amendment No. 9 of Contract E-898 with Horner and Shifrin, Inc., for
additional engineering services for the final design of Lower Meramec River
Wastewater System Improvements Baumgartner Interceptor Tunnel and Lift
Station (95066B); said contract amendment to be comprised of such terms and
conditions as are approved by the office of the General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance, shall
take effect immediately upon its enactment.
The foregoing Ordinance was adopted March 22, 2005.