HomeMy Public PortalAbout11961O R D I N A N C E NO. 11961 AN ORDINANCE, appropriating One Hundred Forty-five Thousand
Dollars ($145,000.00) from the Sanitary Replacement Fund for engineering services
for the final design of Southern Arsenal ORS Interceptor Improvements (2003097-
01) and authorizing the Executive Director and Secretary-Treasurer on behalf of
The Metropolitan St. Louis Sewer District to enter into Contract E-1133 with
Attebery Engineering, Inc. for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of One Hundred Forty-five Thousand Dollars
($145,000.00) is hereby appropriated from the Sanitary Replacement Fund for
engineering services for the final design of Southern Arsenal ORS Interceptor
Improvements (2003097-01).
Section Two. The Executive Director and Secretary-Treasurer are
hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract E-1133 with Attebery Engineering, Inc. for the engineering services
for the final design of Southern Arsenal ORS Interceptor Improvements (2003097-
01); said contract to be comprised of such terms and conditions as are approved by
the office of the General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance shall take
effect immediately upon its enactment.
The foregoing Ordinance was adopted April 14, 2005.