Loading...
HomeMy Public PortalAbout12045O R D I N A N C E NO. 12045 AN ORDINANCE, making a supplemental appropriation of Two Million Three Hundred Thousand Dollars ($2,300,000.00) from the Sanitary Replacement Fund for additional engineering services for the final design of Grand Glaize WWTP Improvements – Engineering Construction Services (Phase I)(2003061); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 8 and all future amendments required to complete Contract E-1047 with HDR Engineering, Inc. for the aforesaid additional engineering services. WHEREAS, Ordinance No. 11541, adopted July 10, 2003, appropriated the initial funding for and authorized Contract E-1047, and WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Two Million Three Hundred Thousand Dollars ($2,300,000.00) is hereby appropriated from the Sanitary Replacement Fund for additional engineering services for the final design of Grand Glaize WWTP Improvements – Engineering Construction Services (Phase I)(2003061). Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 8 and all future amendments required to complete Contract E- 1047 with HDR Engineering, Inc. for additional engineering services for the final design of Grand Glaize WWTP Improvements – Engineering Construction Services (Phase I)(2003061); said contract amendment to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted August 11, 2005.