HomeMy Public PortalAbout12174O R D I N A N C E NO. 12174 AN ORDINANCE, appropriating Four Hundred Fifty-Two Thousand
Dollars ($452,000.00) from the Sanitary Replacement Fund for engineering services
for the design of CSO – Shaftsbury Avenue and Wild Cherry Lane CSO Interceptor
(I-186, 178/L-094) Consolidation (2005114) and authorizing the Executive Director
and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to
enter into Contract E-1170 with Engineering Design Source, Inc., for the aforesaid
engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Four Hundred Fifty-Two Thousand Dollars
($452,00.00) is hereby appropriated from the Sanitary Replacement Fund for
engineering services for the design of CSO – Shaftsbury Avenue and Wild Cherry
Lane CSO Interceptor (I-186, 178/L-094) Consolidation (2005114).
Section Two. The Executive Director and Secretary-Treasurer are
hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract E-1170 with Engineering Design Source, Inc., for engineering services
for the design of CSO – Shaftsbury Avenue and Wild Cherry Lane CSO Interceptor
(I-186, 178/L-094) Consolidation (2005114); said contract to be comprised of such
terms and conditions as are approved by the office of the General Counsel of the
District.
Section Three. This ordinance, being an appropriation ordinance, shall
take effect immediately upon its enactment.
The foregoing ordinance was adopted March 9, 2006.