HomeMy Public PortalAbout12272O R D I N A N C E NO. 12272 AN ORDINANCE, making a supplemental appropriation of Five
Hundred Thousand Dollars ($500,000.00) from the Sanitary Replacement Fund for
additional engineering services for the preliminary design of Blackstone –
Clarendon Combined Sewer System (2003087); and authorizing the Executive
Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer
District to enter into Amendment No. 5 to Contract E-1081 with Parsons Water &
Infrastructure, Inc., for the aforesaid engineering services.
WHEREAS, Ordinance No. 11646 adopted December 11, 2003,
appropriated the initial funding for and authorized Contract E-1081, and
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Five Hundred Thousand Dollars
($500,000.00) is hereby appropriated from the Sanitary Replacement Fund for
engineering services for the preliminary design of Blackstone – Clarendon
Combined Sewer System (2003087).
Section Two. The Executive Director and Secretary-Treasurer are
hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter
into Amendment No. 5 to Contract E-1081 with Parsons Water & Infrastructure,
Inc., for additional engineering services for the preliminary design of Blackstone –
Clarendon Combined Sewer System (2003087)); said contract to be comprised of
such terms and conditions as are approved by the office of the General Counsel of
the District.
Section Three. This ordinance, being an appropriation ordinance, shall
take effect immediately upon its enactment.
The foregoing Ordinance was adopted August 10, 2006.