HomeMy Public PortalAbout12283O R D I N A N C E NO. 12283 AN ORDINANCE, appropriating Four Hundred Eighty-five Thousand
Dollars ($485,000.00) from the Sanitary Replacement Fund for engineering services
for the design of Gravois Trunk (Whitecliff to RDP) Sanitary Relief Phase IV
(90032C) and authorizing the Executive Director and Secretary-Treasurer on behalf
of The Metropolitan St. Louis Sewer District to enter into Contract E-1182 with
HNTB Corporation for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT
Section One. The sum of Four Hundred Eighty-five Thousand Dollars
($485,000.00) is hereby appropriated from the Sanitary Replacement Fund for
engineering services for the design of Gravois Trunk (Whitecliff to RDP) Sanitary
Relief Phase IV (90032C).
Section Two. The Executive Director and Secretary-Treasurer are
hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract E-1182 with HNTB Corporation for engineering services for the
design of Gravois Trunk (Whitecliff to RDP) Sanitary Relief Phase IV (90032C); said
contract to be comprised of such terms and conditions as are approved by the office
of the General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance, shall
take effect immediately upon its enactment.
The foregoing Ordinance was adopted August 31, 2006.