HomeMy Public PortalAbout12337 O R D I N A N C E NO. 12337
AN ORDINANCE, appropriating a total of Two Million Six
Hundred Seventy Thousand Dollars ($2,670,000.00), to be funded as
follows: Four Hundred Fifty Thousand Dollars ($450,000.00) from the
Operation, Maintenance and Construction Improvement Fund of
Coldwater Creek, and Two Million Two Hundred Twenty Thousand
Dollars ($2,220,000.00) from the Sanitary Replacement Fund, to be used
for project costs for the construction of sanitary sewers and concrete
channel in Daniel Boone Trunk Sewer and Channel Replacement
(2001063), in the City of Florissant, Missouri; and authorizing the
Executive Director and Secretary-Treasurer on behalf of The Metropolitan
St. Louis Sewer District to enter into a contract with Bates Utility
Company, Inc., for the construction of the aforesaid sanitary sewers and
concrete channel.
WHEREAS, the bid for the construction of said sanitary
sewers and concrete channel is Two Million Five Hundred Forty-one
Thousand Two Hundred Ninety-five Dollars ($2,541,295.00), and the
allowance for construction change orders is One Hundred Twenty-eight
Thousand Seven Hundred Five Dollars ($128,705.00), and
WHEREAS, the Director of Finance has certified that there is
an unencumbered balance in the above-named funds sufficient to pay
the obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The total sum of Two Million Six Hundred
Seventy Thousand Dollars ($2,670,000.00), to be funded as follows: Four
Hundred Fifty Thousand Dollars ($450,000.00) from the Operation,
Maintenance and Construction Improvement Fund of Coldwater Creek,
and Two Million Two Hundred Twenty Thousand Dollars ($2,220,000.00)
from the Sanitary Replacement Fund, is hereby appropriated to be used
for project costs for the construction of sanitary sewers and concrete
channel in Daniel Boone Trunk Sewer and Channel Replacement
(2001063), in the City of Florissant, Missouri.
Section Two. The Executive Director and Secretary-
Treasurer are hereby authorized on behalf of The Metropolitan St. Louis
Sewer District to enter into a contract with Bates Utility Company, Inc.,
as the lowest responsible bidder for the construction of sanitary sewers
and concrete channel in Daniel Boone Trunk Sewer and Channel
Replacement (2001063), in the City of Florissant, Missouri, pursuant to
bids received and opened on the 31st day of August, 2006.
Section Three. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted November 9, 2006.