Loading...
HomeMy Public PortalAboutTVinsprptfile:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] TV Inspection Report 1 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 LINE SEGMENT: (09A)7446 - (09A)7445 Televised: 2/12/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 6.5 Pipe Material: vcp Tape: 2 Tape Start: 0 Tape Stop: 740 Total Footage: 182 Surface Condition: Front Yard Crew: jw ,lk , Location: buehrle dr Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 0 U Inspection Begin DS, 25 U Roots Joint Light, Quadrant 3, 20 U Pipe Change DIP/CIP, 69 U Connectn Break-In L, Quadrant 3, dye test pos. ph1555-2555 52 U Camera Blocked, mineral deposits 52 U Reverse Set-up, setup on 7445 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 8 D Inspection Begin US, 10 D Crack Circular, 10 D Sag Begin, 13 D Crack Longitudinal, 17 D Roots Joint Light, Crack Multiple, 28 D Crack Multiple, Sag End, 33 D Roots Joint Light, 36 D Crack Multiple, 41 D Joint Cracked, Roots Joint Light, 54 D Crack Multiple, 54 D Roots at Cnctn Mediu, ph15815-ph25815 54 D Connectn Break-In R, 55 D Crack Multiple, 57 D Roots in Cnctn Light, 73 D Crack Multiple, Joint Cracked, 89 D Crack Multiple, 109 D Connectn Break-In L, 125 D Joint Cracked, file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 130 D Camera Blocked, Cnctn Protruding>1"R, 130 D Connectn Break-In R, 139 D Roots Joint Light, 151 D Pipe Change DIP/CIP, 152 D Camera Blocked, LINE SEGMENT: (09A)7461 - (09A)7460 Televised: 3/11/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 3 Pipe Material: vcp Tape: 3 Tape Start: 5100 Tape Stop: 107.1 Total Footage: 145 Surface Condition: Back Yard Crew: lk ,jw ,pk Location: Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 2 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 8 U Inspection Begin DS, Crack Multiple, Quadrant 3, 11 U Joint Cracked, Quadrant 3, 13 U Pipe Change to PVC, 20 U Joint Cracked, Quadrant 2, 41 U Roots Joint Light, Joint Cracked, Quadrant 3, 95 U Joint Cracked, Quadrant 3, 116 U Roots Joint Light, Joint Cracked, Quadrant 2, 120 U Joint Cracked, Quadrant 2, 124 U Roots Joint Light, Quadrant 2, 136 U Joint Infil Heavy, Quadrant 4, dye test positive 140 U Crack Multiple, Quadrant 1, 145 U Inspection End DS, LINE SEGMENT: (09A)7462 - (09A)7461 Televised: 3/11/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 4 Pipe Material: vcp Tape: 3 Tape Start: 43 Tape Stop: 151 Total Footage: 110 Surface Condition: Back Yard Crew: jw ,lk , Location: dogwood Comments: file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Total Points: 0 FOOTAGE U/D OBSERVATIONS 8 D Inspection Begin DS, 11 D Crack Circular, Quadrant 2, 17 D Crack Multiple, Quadrant 3, 110 D Inspection End DS, LINE SEGMENT: (09A)7471 - (09A)7462 Televised: 3/11/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 4 Pipe Material: vcp Tape: 3 Tape Start: 3100 Tape Stop: 4300 Total Footage: 210 Surface Condition: Street (Paved) Crew: jw ,lk , Location: dogwood dr Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 8 D Inspection Begin US, 43 D Crack Multiple, Quadrant 2, 54 D Crack Multiple, Quadrant 3, 72 D Crack Multiple, Quadrant 2, 98 D file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Roots Joint Light, Crack Multiple, Quadrant 2, 108 D Roots Joint Light, Quadrant 2, 111 D Roots in Cnctn Light, Quadrant 1, 117 D Roots in Cnctn Light, Quadrant 1, 119 D Roots in Cnctn Heavy, Quadrant 4, 124 D Pipe Change to PVC, 8 U Inspection Begin DS, 10 U Roots Joint Light, Quadrant 2, 15 U Roots Joint Light, Quadrant 2, 20 U Roots Joint Light, Quadrant 3, 3 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 25 U Root Joint Medium, Quadrant 3, Pipe Broken, 30 U Roots Joint Light, Quadrant 3, 35 U Roots Joint Light, Quadrant 3, file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 42 U Roots at Defect Ligh, Crack Open, Quadrant 3, 45 U Roots Joint Light, Quadrant 3, Crack Multiple, 50 U Roots Joint Light, Quadrant 3, 56 U Roots Joint Light, Quadrant 3, Crack Multiple, 61 U Roots Joint Light, Joint Cracked, Quadrant 3, 65 U Crack Multiple, Pipe Missing, Quadrant 3, 75 U Crack Multiple, Quadrant 3, 80 U Crack Multiple, Roots at Defect Medi, Quadrant 3, 85 U Crack Multiple, Roots at Defect Ligh, Quadrant 3, 90 U Crack Multiple, Roots at Cnctn Mediu, Roots Joint Heavy, Quadrant 1, 98 U Connection Factory L, Quadrant 4, 98 U Camera Blocked, LINE SEGMENT: (09A)7491 - (09A)7492 Televised: 2/18/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 6 Pipe Material: other Tape: 2 Tape Start: 1 Tape Stop: 118 Total Footage: 306 Surface Condition: Street (Paved) Crew: jw , , Location: Comments: Total Points: 0 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] FOOTAGE U/D OBSERVATIONS 8 D Pipe Hole In, 39 D Connection Factory R, 39 D Cnctn Infilt Outside, Camera Blocked, 40 D , Pipe Hole In, 40 D Cnctn Protruding>1"L, 41 D Connectn Break-In L, 74 D Connectn Break-In L, 141 D Connectn Break-In R, 144 D Connectn Break-In L, 269 D Roots in Cnctn Heavy, 286 D Roots at Cnctn Heavy, 287 D Camera Blocked, 306 D Inspection End US, LINE SEGMENT: (09A)7842 - (09A)7810 Televised: 3/12/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 6 Pipe Material: other Tape: 4 Tape Start: 0 Tape Stop: 10.18 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Total Footage: 129 Surface Condition: Front Yard Crew: lk ,jw ,pk Location: yorktown Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 8 U Inspection Begin DS, 65 U Connection Factory L, Quadrant 3, 4 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 69 U Pipe Hole In, Quadrant 1, 98 U Connectn Break-In L, Quadrant 1, 129 U Inspection End DS, Manhole Downstream, Quadrant 3, dye test neg-pipe leaking in mh 7810 LINE SEGMENT: (10A)7131 - (10A)7130 Televised: 5/1/02 Review Date: 1/1/00 Pipe Dia: 15 Invert Depth: 8 Pipe Material: other Tape: 29 Tape Start: 000 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Tape Stop: 2008 Total Footage: 239 Surface Condition: Open Field Crew: lk ,jw ,ng Location: W Edgewood Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 1 U Inspection Begin DS, 37 U Roots Joint Light, 126 U Pipe Hole In, Quadrant 1, PH 11743 Main under pipe at creek dye 126 U , dye test neg 188 U Roots Joint Light, 238 U Roots Joint Light, at MH 7130 239 U Inspection End DS, PH 11746 MH 7130 LINE SEGMENT: (10B)8517 - (10B)7196 Televised: 3/13/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 4.7 Pipe Material: other Tape: 7 Tape Start: 427 Tape Stop: 1737 Total Footage: 214 Surface Condition: Front Yard Crew: lk ,pk ,em Location: country ridge dr Comments: Total Points: 0 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] FOOTAGE U/D OBSERVATIONS 2 U Inspection Begin DS, Connectn Break-In R, Quadrant 1, 4 U Connectn Break-In L, Quadrant 4, 93 U Connectn Break-In L, Quadrant 4, 103 U Connectn Break-In R, Quadrant 1, 182 U Connectn Break-In L, Quadrant 4, 197 U Connectn Break-In R, Quadrant 1, 214 U Inspection End DS, LINE SEGMENT: (10B)8559 - (10B)8558 Televised: 3/13/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 3.5 Pipe Material: pvc Tape: 7 Tape Start: 1737 Tape Stop: 2836 Total Footage: 142 Surface Condition: Back Yard Crew: lk ,pk ,em Location: Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 2 U Inspection Begin DS, 9 U Connection Factory R, Quadrant 1, file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 5 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 38 U Pipe Mat Change Unkn, 52 U Pipe Hole In, Quadrant 1, 112 U Connection Factory R, Quadrant 1, 142 U Inspection End DS, LINE SEGMENT: (10B)8712 - (10B)8711 Televised: 3/12/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 4 Pipe Material: other Tape: 5 Tape Start: 1031 Tape Stop: 2120 Total Footage: 107 Surface Condition: Back Yard Crew: lk ,jw ,pk Location: hobbs Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 8 D Inspection Begin US, 21 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] D Connectn Break-In R, Quadrant 1, ph 1973-ph 2973 729 hobbs dye test pos 0 , loose band on service at main 107 D Inspection End US, LINE SEGMENT: (10B)8715 - (10B)8714 Televised: 3/12/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 4 Pipe Material: other Tape: 5 Tape Start: 0 Tape Stop: 1031 Total Footage: 214 Surface Condition: Back Yard Crew: lk ,jw ,pk Location: hobbs ln Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 2 U Inspection Begin DS, 2 U Connection Factory R, Quadrant 1, 736 hobbs ln ph 1962 ph 2962 6 U Cnctn Infilt Inside, Quadrant 1, 736 hobbs ln dye test pos LINE SEGMENT: (10B)8745 - (10B)8756 Televised: 3/13/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 7.1 Pipe Material: other Tape: 7 Tape Start: 0 Tape Stop: 427 Total Footage: 76 Surface Condition: Front Yard Crew: lk ,pk ,em file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Location: hobbs rd Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 2 U Inspection Begin DS, Quadrant 4, 76 U Inspection End DS, LINE SEGMENT: (10D)8768 - (10D)8773 Televised: 3/12/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 5.5 Pipe Material: other Tape: 6 Tape Start: 0 Tape Stop: 3532 Total Footage: 243 6 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 Surface Condition: Front Yard Crew: lk ,pk , Location: Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 8 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] U Inspection Begin DS, 13 U Roots Joint Light, Quadrant 1, 18 U Connection Factory L, Quadrant 4, 28 U Connectn Break-In R, Quadrant 1, 78 U Connectn Break-In L, Quadrant 4, 87 U Connectn Break-In R, Quadrant 1, 101 U Roots Joint Light, Quadrant 1, 123 U Connectn Break-In R, Roots at Cnctn Heavy, Quadrant 1, 126 U Roots Joint Light, Quadrant 3, 131 U Connectn Break-In L, Quadrant 3, 176 U Connectn Break-In R, Roots at Cnctn Mediu, Quadrant 1, ph 19912 dye test pos-1318 grandview 0 , around service 207 U Connectn Break-In C, 213 U Pipe Hole In, Quadrant 4, 241 U Pipe Change to VCP, 243 U Inspection End DS, LINE SEGMENT: (10D)8820 - (10D)8816 Televised: 2/12/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 4 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Pipe Material: pvc Tape: 1 Tape Start: 409 Tape Stop: 2943 Total Footage: 251 Surface Condition: Other Crew: jw ,lk , Location: scruggs station Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 67 U Connection Factory L, Quadrant 3, exposed gravel ph 1541 67 U Joint Infil Heavy, Quadrant 3, die test pos ph 1547 vc 1547 135 U Connection Factory L, Quadrant 3, 214 U Connection Factory R, Quadrant 1, 239 U Pipe Hole In, Quadrant 1, has been repaired 251 U Inspection End US, ph 1545 LINE SEGMENT: (10D)8850 - (10D)8843 Televised: 2/12/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 0 Pipe Material: dip Tape: 1 Tape Start: 0 Tape Stop: 402 Total Footage: 63 Surface Condition: Back Yard Crew: lk ,jw , Location: Comments: Total Points: 0 FOOTAGE file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] U/D OBSERVATIONS 8 U Inspection Begin DS, 19 U Pipe Change to PVC, Joint Infil Evidence, 7 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 63 U Manhole Downstream, LINE SEGMENT: (11)15041 - (11)9399 Televised: 4/18/02 Review Date: 1/1/00 Pipe Dia: 6 Invert Depth: 3.5 Pipe Material: vcp Tape: 18 Tape Start: 000 Tape Stop: 2152 Total Footage: 191 Surface Condition: Front Yard Crew: lk ,pk ,ng Location: st mary's and ohio Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 0 U Inspection Begin DS, file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 2 U Pipe Hole In, Quadrant 1, 6 U Joint Cracked, 28 U Roots Joint Light, after root cut 32 U Roots Joint Light, 35 U Roots Joint Light, 37 U Roots Joint Light, 41 U Root Joint Medium, 47 U Roots Joint Light, 49 U Roots Joint Light, 51 U Root Joint Medium, 55 U Joint Cracked, light roots in joint 61 U Joint Cracked, Roots Joint Light, 63 U Roots Joint Light, 65 U Joint Cracked, 67 U Root Joint Medium, 79 U Joint Cracked, Roots Joint Light, 81 U Joint Cracked, 85 U Pipe Hole In, at joint file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 87 U Roots Joint Light, 89 U Roots Joint Light, 98 U Roots Joint Light, 108 U Joint Cracked, 116 U Joint Cracked, 165 U Joint Infil Heavy, I & I dye test positive 171 U Roots Joint Light, 177 U Joint Infil Heavy, dye test positive 183 U Joint Cracked, 186 U Inspection End DS, LINE SEGMENT: (11)15080 - (11)9395 Televised: 4/24/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 3 Pipe Material: other Tape: 22 Tape Start: Tape Stop: Total Footage: 33 Surface Condition: Crew: lk ,jw , Location: Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 8 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 0 U Inspection Begin DS, 33 U Inspection End DS, LINE SEGMENT: (11)15081 - (11)9448 Televised: 4/23/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 3 Pipe Material: pvc Tape: 20 Tape Start: 000 Tape Stop: 1809 Total Footage: 102 Surface Condition: Street (Paved) Crew: lk ,ng ,kl Location: Busch St Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 1 D Inspection Begin US, 7 D Connectn Break-In L, Quadrant 4, 49 D Connectn Break-In L, Quadrant 4, 50 D file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Connectn Break-In R, Quadrant 1, 95 D Connectn Break-In L, Quadrant 4, 99 D Jeter On, dye test neg. manhole defect 100 D Inspection End US, Manhole Buried, MH 15081 LINE SEGMENT: (11)2307 - (11)2308 Televised: 4/18/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 8 Pipe Material: vcp Tape: 18 Tape Start: 2152 Tape Stop: 4714 Total Footage: 300 Surface Condition: Street (Paved) Crew: lkp,kng,kl Location: Mullberry at alley Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 0 D Inspection Begin US, 50 D Pipe Hole In, Quadrant 4, 69 D Connectn Break-In R, Quadrant 1, Roots at Cnctn Light, 67 D Roots Joint Light, 69 D Roots Joint Light, 73 D Roots Joint Heavy, 74 D Connection Factory L, Quadrant 4, file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 75 D Roots Joint Heavy, 77 D Connection Factory R, Quadrant 1, 78 D Roots Joint Light, 84 D Roots Joint Light, 88 D Roots Joint Light, 91 D Roots Joint Light, 93 D Roots Joint Light, 95 D Root Joint Medium, 97 D Roots Joint Light, 80 D Roots Joint Light, 101 D Roots Joint Light, 101 D Roots Joint Light, 109 D Root Joint Medium, 80 D Roots Joint Light, file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 9 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 80 D Roots Joint Light, 100 D Pipe Change Smaller, LINE SEGMENT: (11)2311 - (11)2310 Televised: 4/30/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 12 Pipe Material: vcp Tape: 26 Tape Start: 000 Tape Stop: 936 Total Footage: 325 Surface Condition: Street (Paved) Crew: lk ,jw ,ng Location: elm street Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 1 D Inspection Begin US, Crack Multiple, Joint Offset Moderat, roots in joint 28 D Root Joint Medium, 50 D Cnctn Infilt Outside, Cnctn Protruding>1"L, Quadrant 4, 28 D Cnctn Infilt Outside, Jeter On, Camera Blocked, Quadrant 4, 312 elm st-water valve dye test neg LINE SEGMENT: (11)2313 - (11)2310 Televised: 3/18/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 6.5 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Pipe Material: vcp Tape: 8 Tape Start: 0 Tape Stop: 109.31 Total Footage: 499 Surface Condition: Street (Paved) Crew: lk ,jw ,ng Location: dunklin st Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 8 U Inspection Begin DS, 53 U Joint Infil Evidence, Quadrant 4, 58 U Joint Infil Evidence, Quadrant 3, 63 U Joint Infil Evidence, Quadrant 2, 68 U Joint Infil Evidence, Quadrant 3, 71 U Joint Infil Evidence, Quadrant 2, 73 U Joint Infil Evidence, Quadrant 2, 76 U Joint Infil Evidence, Quadrant 2, 81 U Joint Infil Evidence, Quadrant 2, 86 U Joint Infil Evidence, Quadrant 2, 88 U Joint Infil Evidence, Quadrant 2, 96 U Joint Infil Evidence, Quadrant 3, 101 U file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Joint Infil Evidence, Quadrant 2, 111 U Joint Infil Evidence, Quadrant 2, 113 U Connectn Abandoned L, Quadrant 4, 116 U Connectn Break-In R, Quadrant 1, 119 U Joint Infil Evidence, Quadrant 3, 126 U Joint Infil Evidence, Quadrant 3, 142 U Joint Infil Evidence, 158 U Joint Infil Evidence, 164 U Connectn Break-In R, Quadrant 1, 167 U Connectn Break-In L, Quadrant 3, 176 U Joint Infil Evidence, 177 U Connectn Abandoned L, Quadrant 3, 10 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 197 U Joint Infil Evidence, file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 202 U Joint Infil Evidence, 213 U Connectn Break-In R, Quadrant 1, 216 U Connectn Abandoned L, Quadrant 4, 218 U Connectn Abandoned L, Quadrant 4, 222 U Joint Infil Evidence, 232 U Joint Infil Evidence, 248 U Joint Infil Evidence, 275 U Connectn Abandoned L, Quadrant 4, 276 U Joint Infil Evidence, 285 U Connectn Abandoned C, 295 U Joint Infil Evidence, 324 U Connectn Break-In R, Quadrant 1, 338 U Connectn Abandoned R, Quadrant 1, 345 U Connectn Abandoned L, Quadrant 4, 352 U Joint Infil Evidence, 374 U Connectn Abandoned L, Quadrant 4, 405 U Connectn Break-In L, Quadrant 4, 435 U Connectn Break-In L, Quadrant 4, file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 438 U Connectn Abandoned R, Quadrant 1, 479 U Joint Infil Evidence, 486 U Flow > 51%, 50 U Camera Submerged, Camera Submerged, 50 U Camera Submerged, Camera Submerged, LINE SEGMENT: (11)2315 - (11)2313 Televised: 3/18/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 6.5 Pipe Material: vcp Tape: 9 Tape Start: 3417 Tape Stop: Total Footage: 100 Surface Condition: Street (Paved) Crew: lk ,jw ,ng Location: dunklin st Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 0 D Inspection Begin DS, camera would not fit-waiting for dye 0 D Inspection End DS, 100 D Manhole Buried, dye test negative LINE SEGMENT: (11)2317 - (11)2313 Televised: 3/18/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 6.5 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Pipe Material: vcp Tape: 9 Tape Start: 0 Tape Stop: 3355 Total Footage: 498 Surface Condition: Street (Paved) Crew: lk ,jw ,ng Location: dunklin st Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 8 D Inspection Begin US, 73 D Roots Joint Light, Quadrant 3, 75 D Roots Joint Light, Quadrant 3, 11 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 83 D Roots Joint Light, Quadrant 3, 86 D Roots in Cnctn Mediu, Connectn Abandoned L, Quadrant 3, 88 D Roots Joint Light, Quadrant 3, 117 D Roots Joint Light, file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 122 D Root Joint Medium, Quadrant 3, 140 D Pipe Hole In, Quadrant 1, ph 110710 gas line top of pipe 145 D Roots Joint Light, 147 D Root Joint Medium, 149 D Roots at Cnctn Mediu, Quadrant 4, 152 D Roots Joint Light, 165 D Root Joint Medium, 188 D Roots Joint Light, 245 D Pipe Hole In, Quadrant 1, ph 110717 ph 210717 large gas main in 0 , top 1/3 of pipe 260 D Pipe Change to PVC, Pipe Collapsed, ph 110718 ph 110719 ph 210719 old repair 0 , repair collapsed 260 D Camera Blocked, Quadrant 1, ph 110720 cannot get through repair LINE SEGMENT: (11)2321 - (11)2320 Televised: 4/30/02 Review Date: 1/1/00 Pipe Dia: 6 Invert Depth: 6 Pipe Material: vcp Tape: 26 Tape Start: 2435 Tape Stop: 2755 Total Footage: 257 Surface Condition: Street (Paved) Crew: lk ,jw ,ng Location: broadway and ashley file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 1 U Inspection Begin DS, 33 U Jeter On, Inspection End DS, dye test neg LINE SEGMENT: (11)2322 - (11)2321 Televised: 4/30/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 6 Pipe Material: vcp Tape: 26 Tape Start: 936 Tape Stop: 2435 Total Footage: 150 Surface Condition: Street (Paved) Crew: lk ,jw ,ng Location: broadway and ashley Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 1 D Inspection Begin US, Pipe Hole In, Quadrant 4, at joint 3 D Joint Infil Heavy, dye test pos 7 D Joint Infil Heavy, 28 D Joint Infil Heavy, PH 11675 30 D Joint Infil Heavy, 118 D Connection Factory L, Quadrant 4, 118 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] D Pipe Change Smaller, Camera Blocked, unknown size, pipe too small LINE SEGMENT: (11)2325 - (11)2321 Televised: 4/30/02 Review Date: 1/1/00 Pipe Dia: 6 Invert Depth: 6 Pipe Material: vcp 12 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 Tape: no tape Tape Start: 0 Tape Stop: Total Footage: 490 Surface Condition: Street (Paved) Crew: lk ,jw ,ng Location: broadway and ashley Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 0 D Inspection Begin US, Jeter On, Inspection End US, dye test neg LINE SEGMENT: (11)2331 - (11)2334 Televised: 4/26/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 5.5 Pipe Material: vcp Tape: 25 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Tape Start: 000 Tape Stop: 2314 Total Footage: 200 Surface Condition: Street (Paved) Crew: lk ,jw ,pk Location: washington Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 1 D Inspection Begin US, 1 D Joint Offset Moderat, 12 D Crack Multiple, Quadrant 1, DYE TEST POS.- STORM DRAIN 14 D Crack Longitudinal, Quadrant 1, 20 D Connectn Break-In L, 69 D Connectn Break-In L, Quadrant 4, 72 D Connectn Abandoned R, 73 D Connectn Abandoned L, Quadrant 4, 91 D Connectn Break-In R, Quadrant 1, 106 D Joint Cracked, 120 D Connectn Abandoned R, Quadrant 1, 122 D Connectn Abandoned L, Quadrant 4, 128 D Connectn Break-In L, Quadrant 3, 159 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] D Root Joint Medium, 161 D Root Joint Medium, 162 D Cnctn Protruding>1"R, Quadrant 1, 163 D Roots Joint Light, 163 D Camera Blocked, at tap LINE SEGMENT: (11)2339 - (11)2313 Televised: 3/18/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 6.5 Pipe Material: vcp Tape: Tape Start: Tape Stop: Total Footage: 72 Surface Condition: Crew: jw ,lk , Location: Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 0 D Inspection Begin DS, no tv-high flow neg dye test LINE SEGMENT: (11)2345 - (11)2344 Televised: 5/1/02 Review Date: 1/1/00 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 13 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 Pipe Dia: 10 Invert Depth: 7 Pipe Material: rcp Tape: no tape Tape Start: 000 Tape Stop: 000 Total Footage: 135 Surface Condition: Open Field Crew: lk ,jw ,ng Location: HWY 54 Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 1 U Inspection Begin DS, 14 U Jeter On, dye test neg- smoke from abandoned line 0 , in MH 2345- lamped from MH LINE SEGMENT: (11)2361 - (11)2356 Televised: 4/15/02 Review Date: 1/1/00 Pipe Dia: 6 Invert Depth: 13.6 Pipe Material: vcp Tape: 17 Tape Start: 4208 Tape Stop: 1081 Total Footage: 110 Surface Condition: Street (Paved) Crew: lkn,gkl, Location: Washington St Comments: Total Points: 0 FOOTAGE U/D file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] OBSERVATIONS 0 U Inspection Begin DS, 4 U Root Joint Medium, 6 U Root Joint Medium, 7 U Roots Joint Light, 9 U Root Joint Medium, 11 U Roots Joint Light, 15 U Joint Cracked, roots in joint 17 U Joint Cracked, roots in joint 31 U Roots Joint Light, 33 U Joint Cracked, roots in joint 35 U Roots Joint Light, 39 U Roots Joint Light, 41 U Joint Cracked, roots in joint 43 U Joint Cracked, Root Joint Medium, 45 U Roots Joint Light, 47 U Pipe Broken, Root Joint Medium, 50 U Roots Joint Light, 52 U file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Roots Joint Light, 58 U Root Joint Medium, 60 U Roots Joint Light, 64 U Root Joint Medium, 66 U Joint Cracked, roots in joint 69 U Roots Joint Light, 72 U Root Joint Medium, 77 U Roots Joint Light, 81 U Roots Joint Light, 85 U Joint Separated, 87 U Joint Infil Heavy, Ph 11443 Plh 21443 dye test positive 0 , at creek crossing. 89 U Joint Cracked, roots in joint 14 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 93 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] U Roots Joint Light, 95 U Roots Joint Light, 97 U Roots Joint Light, 99 U Root Joint Medium, 101 U Roots Joint Light, 103 U Inspection End DS, LINE SEGMENT: (11)2362Z - (11)2362 Televised: 4/15/02 Review Date: 1/1/00 Pipe Dia: 6 Invert Depth: 4 Pipe Material: vcp Tape: 17 Tape Start: 000 Tape Stop: 4208 Total Footage: 201 Surface Condition: Street (Paved) Crew: lkn,gkl, Location: Washington & Fillmore Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 0 D Inspection Begin US, 14 D Connectn Break-In L, Quadrant 3, Hole in pipe under service 19 D Joint Infil Heavy, dye test positive 21 D Pipe Change to PVC, Old Repair 24 D file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Joint Infil Heavy, end repair dye test positive 55 D Joint Cracked, Quadrant 1, 57 D Jeter On, dye test negative 69 D Roots Joint Light, 74 D Roots Joint Light, 76 D Roots Joint Light, 77 D Joint Cracked, Quadrant 1, 86 D Roots Joint Light, 88 D Root Joint Medium, 90 D Roots Joint Light, 91 D Roots Joint Light, 93 D Roots Joint Heavy, 94 D Camera Blocked, 94 D Roots Joint Light, ater rootcut 97 D Roots Joint Light, 99 D Roots Joint Light, 105 D Roots Joint Light, 107 D Roots Joint Light, 109 D file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Roots Joint Light, 111 D Roots Joint Light, 115 D Roots Joint Light, 117 D Root Joint Medium, 119 D Roots Joint Light, 121 D Root Joint Medium, 125 D Joint Separated, 129 D Root Joint Medium, 131 D Root Joint Medium, 135 D Roots Joint Heavy, 136 D Root Joint Medium, after rootcut 146 D Roots Joint Light, 150 D Roots Joint Light, 159 D Roots Joint Light, 15 Jefferson City, MO - SSES Page# file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 9:45:54 AM Wednesday, September 04, 2002 174 D Jeter On, dye test negative 174 D Pipe Change to PVC, old repair 176 D Connection Factory R, 179 D Joint Cracked, 180 D Connectn Break-In L, 180 D Pipe Change to VCP, 199 D Roots Joint Light, 201 D Inspection End US, no upstream MH caped off LINE SEGMENT: (11)2366 - (11)2367 Televised: 4/30/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 5 Pipe Material: vcp Tape: 27 Tape Start: 000 Tape Stop: 507 Total Footage: 400 Surface Condition: Street (Paved) Crew: lk ,jw ,ng Location: Jefferson and Franklin Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 1 D Inspection Begin US, 13 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] D Joint Offset Severe, Jeter On, Camera Blocked, dye test neg LINE SEGMENT: (11)2435 - (11)2454 Televised: 4/2/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 6 Pipe Material: pvc Tape: 11 Tape Start: Tape Stop: 16.37 Total Footage: 120 Surface Condition: Side Yard Crew: jwl,k , Location: Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 8 D Inspection Begin US, 9 D Connectn Break-In L, Connectn Break-In R, positive dye on 53 120 D Inspection End US, LINE SEGMENT: (11)2438 - (11)2442 Televised: 4/2/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 5 Pipe Material: Tape: 11 Tape Start: 20 Tape Stop: 38 Total Footage: 159 Surface Condition: Side Yard Crew: jwl,k , Location: Comments: Total Points: 0 FOOTAGE U/D file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] OBSERVATIONS 8 U Inspection Begin DS, 40 U Joint Infil Heavy, Quadrant 2, 113 U Connectn Break-In R, Quadrant 1, Roots at Cnctn Heavy, 117 U Roots at Cnctn Light, Quadrant 3, positive dye 148 U Crack Circular, Quadrant 3, 159 U Inspection End DS, end inspection 16 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 LINE SEGMENT: (11)2443 - (11)2444 Televised: 3/28/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 6.5 Pipe Material: vcp Tape: 10b Tape Start: Tape Stop: 1940 Total Footage: 123 Surface Condition: Front Yard Crew: LKN,GKL, Location: Hawthorne Parkway Comments: file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Total Points: 0 FOOTAGE U/D OBSERVATIONS 8 U Inspection Begin DS, 10 U Mineral Depo Light, Quadrant 2, 16 U Crack Multiple, Quadrant 1, 18 U Crack Longitudinal, 20 U Grease Light, Quadrant 1, 34 U Joint Cracked, Quadrant 3, dye test positive 37 U Joint Infil Light, Quadrant 3, dye test positive 40 U Joint Infil Heavy, Quadrant 1, dye test positive 48 U Sag Begin, 64 U Sag End, 109 U Connectn Abandoned L, Quadrant 1, 123 U Manhole Downstream, 123 U Inspection End DS, LINE SEGMENT: (11)2446 - (11)2447 Televised: 4/3/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 0 Pipe Material: vcp Tape: 12 Tape Start: 000 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Tape Stop: 2644 Total Footage: 108 Surface Condition: Back Yard Crew: lkn,g , Location: Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 8 D Inspection Begin US, 11 D Roots Joint Light, 14 D Connectn Abandoned L, Quadrant 3, 17 D Roots Joint Light, 28 D Roots at Cnctn Heavy, Quadrant 4, 32 D Joint Infil Heavy, Quadrant 4, dye test positive 35 D Roots Joint Light, 36 D Pipe Change to PVC, 38 D Pipe Change to VCP, light roots at joing 41 D Pipe Change to PVC, 44 D Pipe Change to VCP, 47 D Joint Infil Light, Joint Cracked, Quadrant 1, Quadrant 2, dye test positive 62 D Joint Infil Light, 68 D Joint Infil Heavy, dye test positive file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 96 D Roots Joint Light, 104 D Pipe Broken, 108 D Inspection End US, 17 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 LINE SEGMENT: (11)2447 - (11)2424 Televised: 4/4/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 6.5 Pipe Material: vcp Tape: 12 Tape Start: 2644 Tape Stop: 12126 Total Footage: 299 Surface Condition: Back Yard Crew: lkn,gkl, Location: Linden & Hawthorne Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 233 U Connectn Break-In L, Quadrant 4, 233 U Pipe Missing, Quadrant 1, file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 235 U Connectn Abandoned L, Quadrant 4, 243 U Roots Joint Light, Quadrant 1, 245 U Roots Joint Light, Quadrant 1, 270 U Roots Joint Light, Quadrant 1, 299 U Inspection End DS, 7 U Joint Infil Heavy, dye test positive 22 U Joint Cracked, Quadrant 3, 25 U Joint Cracked, Quadrant 1, 37 U Joint Cracked, Roots Joint Light, Quadrant 1, after root cut 40 U Joint Cracked, Quadrant 1, 53 U Joint Infil Heavy, dye test positive 53 U Connectn Break-In L, Quadrant 3, 63 U Connectn Abandoned L, Quadrant 4, roots in tap 70 U Roots Joint Light, 85 U Crack Circular, 92 U Roots Joint Light, Crack Multiple, 95 U Joint Cracked, 107 U Crack Longitudinal, Quadrant 1, file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 113 U Roots Joint Light, 115 U Joint Cracked, 120 U Connectn Abandoned L, Quadrant 3, 122 U Pipe Change to PVC, PVC repair 139 U Connection Factory L, Quadrant 3, 141 U Pipe Change to VCP, end repair 155 U Joint Cracked, Quadrant 1, 170 U Sag Begin, 174 U Connection Factory C, not sure clock position camera & water 192 U Joint Cracked, Quadrant 3, 194 U Joint Cracked, Quadrant 3, 198 U Joint Cracked, Quadrant 1, 204 U Sag End, 231 U Crack Multiple, LINE SEGMENT: (11)2716 - (11)2460 Televised: 4/3/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 3 Pipe Material: vcp Tape: 11 Tape Start: 3850 Tape Stop: 5136 Total Footage: 49 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Surface Condition: Front Yard Crew: lkn,g , Location: Darlene Street Comments: 18 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 Total Points: 0 FOOTAGE U/D OBSERVATIONS 0 U Cnctn Infilt Inside, Inspection Begin DS, dye test pos. from dnspout at 1120 Darle 8 U Joint Infil Heavy, dye test positive 27 U Pipe Broken, 48 U Pipe Broken, broke at drop 49 U Inspection End DS, camera blocked at drop LINE SEGMENT: (11)8026 - (11)7007 Televised: 4/4/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 15 Pipe Material: pvc Tape: no tape Tape Start: 0 Tape Stop: 0 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Total Footage: 1 Surface Condition: Open Field Crew: lkj,wpk,ng Location: MO Blvd behind Westlakes Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 1 D Inspection Begin DS, dye test positive inside MH 1 D Inspection End DS, 7007 first bottom joint pipe okay LINE SEGMENT: (11)9124 - (11)9123 Televised: 4/5/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 6 Pipe Material: vcp Tape: 13 Tape Start: 2228 Tape Stop: 4426 Total Footage: 297 Surface Condition: Street (Paved) Crew: lkp,kng,kl Location: Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 0 U Inspection Begin DS, 37 U Connection Factory R, Quadrant 1, 107 U Connection Factory R, Quadrant 1, 175 U Joint Infil Heavy, dye test positive 176 U file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Connectn Break-In L, Quadrant 4, dept. of Aging 178 U Joint Infil Light, Quadrant 1, 181 U Joint Infil Heavy, 187 U Joint Infil Heavy, 199 U Joint Infil Heavy, 205 U Joint Infil Heavy, dye test positive 249 U Connection Factory R, Quadrant 1, 297 U Inspection End DS, LINE SEGMENT: (11)9125 - (11)9124 Televised: 4/5/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 3.5 Pipe Material: vcp Tape: 13 Tape Start: 00 Tape Stop: 2228 Total Footage: 119 Surface Condition: Street (Paved) Crew: lkp,kng,kl Location: Howard Street Comments: 19 Jefferson City, MO - SSES Page# file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 9:45:54 AM Wednesday, September 04, 2002 Total Points: 0 FOOTAGE U/D OBSERVATIONS 0 U Inspection Begin DS, 47 U Crack Longitudinal, Quadrant 4, 47 U Connectn Break-In L, Quadrant 4, dye test pos from st. into service-601 52 U Joint Infil Heavy, Quadrant 3, 56 U Roots Joint Light, Joint Infil Light, Quadrant 3, 62 U Crack Multiple, 65 U Crack Longitudinal, Quadrant 1, dye test positive 74 U Joint Infil Light, Quadrant 1, 80 U Joint Infil Heavy, Quadrant 3, 83 U Joint Infil Heavy, Quadrant 2, 87 U Connection Factory R, abundant. hole in side of plug 103 U Connectn Break-In L, Quadrant 4, 119 U Inspection End DS, LINE SEGMENT: (11)9203 - (11)9202 Televised: 4/10/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 5 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Pipe Material: vcp Tape: none Tape Start: 000 Tape Stop: 000 Total Footage: 136 Surface Condition: Back Yard Crew: lkd,bem, Location: Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 0 U , MH has 6" PVC overflow to storm box 0 , will not get an I&I LINE SEGMENT: (11)9208 - (11)9209 Televised: 5/1/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 7.6 Pipe Material: vcp Tape: 28 Tape Start: 000 Tape Stop: 4508 Total Footage: 306 Surface Condition: Street (Paved) Crew: lk ,jw ,ng Location: crestmere ct Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 1 U Inspection Begin DS, Crack Multiple, 24 U Joint Cracked, Quadrant 3, 28 U Joint Cracked, Quadrant 3, 48 U file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Connectn Break-In L, Quadrant 4, 62 U Pipe Change to PVC, 63 U Connection Factory L, Quadrant 4, 65 U Pipe Change to VCP, 115 U Connection Factory L, Quadrant 4, 181 U Roots Joint Light, 189 U Root Joint Medium, 190 U Crack Multiple, Pipe Crushed, 191 U Pipe Hole In, Quadrant 3, PH 11711 20 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 192 U Camera Blocked, 1 D Inspection Begin US, 25 D Connectn Break-In C, PH 11722 Dye test pos 31 D Joint Cracked, Quadrant 4, water valve to service file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 35 D Joint Cracked, 39 D Crack Multiple, PH 11725 44 D Connectn Break-In R, Roots at Cnctn Mediu, Quadrant 1, PH 11727 Dye test pos water valve to ser 49 D Connection Factory C, look abandoned 66 D Crack Multiple, Root Joint Medium, at joint 70 D Roots Joint Light, 82 D Crack Multiple, Roots Joint Light, at joint 91 D Joint Cracked, Roots Joint Light, 94 D Roots Joint Heavy, 96 D Connection Factory R, Quadrant 1, 97 D Root Joint Medium, 98 D Crack Multiple, Roots at Defect Medi, 100 D Crack Multiple, roots 103 D Pipe Hole In, 109 D Crack Multiple, Roots at Defect Medi, 111 D Pipe Hole In, 112 D Camera Blocked, Inspection End US, LINE SEGMENT: file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] (11)9212 - (11)15029 Televised: 4/25/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 5 Pipe Material: vcp Tape: 24 Tape Start: 4126 Tape Stop: 10901 Total Footage: 230 Surface Condition: Other Crew: jw ,lk ,pk Location: crestmere Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 1 U Inspection Begin DS, 9 U Joint Infil Light, 19 U Joint Cracked, 29 U Joint Cracked, 34 U Roots Joint Light, 39 U Crack Multiple, 44 U Crack Multiple, at joint roots 49 U Root Joint Medium, Crack Multiple, 54 U Root Joint Medium, Crack Multiple, 64 U Joint Infil Light, 154 U Connectn Break-In R, file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 154 U Roots at Cnctn Mediu, PH 11631 204 U Pipe Hole In, Quadrant 1, 216 U Connectn Break-In R, 216 U Cnctn Infilt Outside, 219 U Roots Joint Light, 230 U Inspection End DS, LINE SEGMENT: (11)9213 - (11)9212 Televised: 4/25/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 5 Pipe Material: vcp 21 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 Tape: 24 Tape Start: 2732 Tape Stop: 4126 Total Footage: 65 Surface Condition: Other Crew: lk ,jw ,pk Location: crestmere ct Comments: Total Points: 0 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] FOOTAGE U/D OBSERVATIONS 3 U Inspection Begin DS, 16 U Connectn Break-In L, Crack Multiple, Quadrant 3, 23 U Connectn Break-In L, Quadrant 3, PH 11626 26 U Joint Infil Heavy, PH 11627 31 U Joint Cracked, Quadrant 1, 36 U Joint Cracked, Quadrant 1, 41 U Joint Cracked, 46 U Joint Cracked, 50 U Joint Infil Heavy, Quadrant 2, 56 U Crack Multiple, at joint 63 U Inspection End DS, LINE SEGMENT: (11)9214 - (11)9213 Televised: 4/25/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 8 Pipe Material: vcp Tape: 24 Tape Start: 1045 Tape Stop: 2732 Total Footage: 186 Surface Condition: Other Crew: lk ,jw ,pk Location: crestmere ct file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 1 U Inspection Begin DS, 28 U Cnctn Infilt Outside, PH 11615 30 U Connectn Break-In R, Roots at Cnctn Mediu, 53 U Cnctn Infilt Outside, Quadrant 1, PH 11616,21616 US 11616 66 U Cnctn Infilt Outside, Quadrant 3, Roots at Cnctn Light, Crack Multiple, PH 11617 92 U Roots at Cnctn Heavy, Quadrant 4, PH 11611 108 U Connection Factory R, Quadrant 3, 109 U Pipe Change to VCP, 127 U Connectn Break-In L, Quadrant 3, 183 U Inspection End DS, LINE SEGMENT: (11)9215 - (11)9214 Televised: 4/25/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 8 Pipe Material: vcp Tape: 24 Tape Start: 0 Tape Stop: 1045 Total Footage: 180 Surface Condition: Crew: lk ,jw ,pk Location: crestmere Comments: Total Points: 0 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] FOOTAGE U/D OBSERVATIONS 1 U Inspection Begin DS, 22 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 4 U Roots Joint Light, Quadrant 2, 21 U Crack Multiple, Root Joint Medium, 70 U Joint Cracked, Quadrant 2, 150 U Roots at Cnctn Heavy, Quadrant 3, 179 U Inspection Begin DS, m.h.. 9214 LINE SEGMENT: (11)9247 - (11)15026 Televised: 4/24/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 3 Pipe Material: vcp Tape: 23 Tape Start: 0 Tape Stop: 4520 Total Footage: 339 Surface Condition: Back Yard Crew: LK ,JW ,PK file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Location: WOODCLIFF DR Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 1 U Inspection Begin DS, 8 U Roots Joint Light, 63 U Crack Multiple, AT JOINT 73 U Joint Cracked, 77 U Joint Infil Light, 79 U Connectn Abandoned R, Quadrant 1, Crack Longitudinal, ROOTS AT CAP ACTIVE I&I 81 U Connection Factory L, Quadrant 4, 84 U Crack Multiple, I&I ACTIVE 84 U Connectn Break-In R, Quadrant 1, 87 U Joint Cracked, 102 U Roots Joint Light, 122 U Root Joint Medium, 141 U Roots Joint Light, 152 U Joint Infil Evidence, 162 U Joint Infil Evidence, 176 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] U Connectn Break-In R, Quadrant 1, 177 U Connectn Abandoned R, ROOTS AND I&I 179 U Connectn Break-In L, Joint Infil Evidence, 215 U Joint Infil Light, Joint Cracked, 254 U Roots Joint Light, 257 U Roots at Cnctn Mediu, Quadrant 4, 261 U Connectn Abandoned R, Quadrant 1, CAP BROKEN 262 U Roots Joint Light, Connectn Abandoned L, ROOTS AT CAP 264 U Crack Multiple, Roots at Defect Medi, 268 U Roots Joint Light, 284 U Roots Joint Light, 298 U Joint Infil Evidence, 305 U Inspection End DS, LINE SEGMENT: (11)9253 - (11)9252 Televised: 4/9/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 10 Pipe Material: vcp Tape: 14 Tape Start: 00 Tape Stop: 3754 Total Footage: 148 Surface Condition: Side Yard Crew: LKN,GDB, Location: file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Comments: 23 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 Total Points: 0 FOOTAGE U/D OBSERVATIONS 0 D Inspection Begin US, 17 D Joint Cracked, Quadrant 1, ROOTS IN CRACKS 25 D Joint Cracked, Quadrant 3, 29 D Pipe Broken, Quadrant 2, 33 D Pipe Broken, Quadrant 3, 49 D Pipe Broken, Quadrant 2, 62 D Connection Factory L, Quadrant 4, 70 D Pipe Hole In, Quadrant 1, 78 D Roots Joint Light, DYE TEST NEGATIVE 80 D Connectn Break-In L, Quadrant 4, 97 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] D Connectn Break-In L, Quadrant 4, 105 D Crack Multiple, 109 D Joint Cracked, Quadrant 2, 113 D Connectn Break-In L, Quadrant 4, 113 D Pipe Broken, Quadrant 2, DYE TEST POS AT JOINT & UNDER SERVICE 117 D Pipe Crushed, Camera Blocked, DYE TEST POS LAST 30' OF PIPE INSPECTED LINE SEGMENT: (11)9254 - (11)9252 Televised: 4/9/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 10 Pipe Material: vcp Tape: 14 Tape Start: 3845 Tape Stop: 10625 Total Footage: 191 Surface Condition: Crew: LKN,GDB,KL Location: SWIFT HWY Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 0 D Inspection Begin US, 11 D Pipe Change to PVC, old repair 30 D Pipe Change to VCP, dye test positive 36 D Joint Infil Heavy, 41 D Crack Longitudinal, file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 44 D Crack Multiple, 49 D Crack Multiple, 55 D Crack Multiple, 60 D Crack Longitudinal, 67 D Crack Multiple, 71 D Crack Multiple, Roots at Defect Medi, ph11371 ph2137 0 , dye test positive 75 D Camera Blocked, camera block at last dye test on line se LINE SEGMENT: (11)9285 - (11)9268 Televised: 4/23/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 4.5 Pipe Material: other Tape: 21 Tape Start: 0 Tape Stop: 454 Total Footage: 39 Surface Condition: Street (Paved) Crew: lk ,ng ,kl Location: woodcliff dr Comments: Total Points: 0 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 24 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 FOOTAGE U/D OBSERVATIONS 1 D Inspection Begin US, 19 D Pipe Hole In, Quadrant 1, 19 D Jeter On, dye test neg 39 D Inspection End US, LINE SEGMENT: (11)9360 - (11)9063 Televised: 4/24/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 9 Pipe Material: vcp Tape: 22 Tape Start: 1049 Tape Stop: 2824 Total Footage: 219 Surface Condition: Street (Paved) Crew: lk ,jw ,pk Location: south st Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 10 U Inspection Begin DS, 53 U Roots in Cnctn Heavy, 102 U Jeter On, dye test neg 186 U file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Camera Submerged, LINE SEGMENT: (11)9388 - (11)9387 Televised: 4/10/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 5.5 Pipe Material: vcp Tape: 15 Tape Start: 3400 Tape Stop: 10588 Total Footage: 161 Surface Condition: Street (Paved) Crew: lkp,kng, Location: laurel drive Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 0 U Inspection Begin DS, 2 U Pipe Change to PVC, old repair 7 U Pipe Change to VCP, end repair 40 U Connectn Abandoned L, Quadrant 4, 51 U Joint Cracked, Quadrant 1, 56 U Connectn Break-In C, dye test positive outside of service 60 U Joint Infil Light, dye test positive 63 U Joint Infil Light, light root in joint 66 U Joint Infil Heavy, roots in joint 69 U Crack Longitudinal, Quadrant 1, file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 72 U Joint Cracked, Quadrant 1, 78 U Crack Multiple, 84 U Joint Cracked, 89 U Connectn Abandoned L, Quadrant 4, broken with roots 99 U Roots Joint Light, 104 U Roots in Cnctn Heavy, Quadrant 4, 105 U Roots Joint Light, 111 U Root Joint Medium, 117 U Joint Cracked, roots in joint 120 U Joint Cracked, roots 128 U Connectn Abandoned L, Quadrant 4, roots in service 25 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 136 U Roots Joint Light, 139 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] U Root Joint Medium, 145 U Roots Joint Light, 148 U Roots Joint Light, 149 U Connectn Break-In L, Quadrant 4, 157 U Inspection End DS, LINE SEGMENT: (11)9390 - (11)9387 Televised: 4/10/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 7 Pipe Material: vcp Tape: 15 Tape Start: 000 Tape Stop: 3345 Total Footage: 124 Surface Condition: Crew: lkp,kng,db Location: laurel drive Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 0 D Inspection Begin US, 22 D Joint Infil Light, 25 D Joint Infil Heavy, 30 D Connectn Abandoned L, Quadrant 4, dye test positive at service 31 D Joint Infil Heavy, dye test positive 36 D Connectn Break-In L, Quadrant 4, file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 43 D Joint Cracked, Quadrant 2, 53 D Roots Joint Light, 53 D Joint Infil Light, Quadrant 3, dye test positive 56 D Roots Joint Light, 59 D Roots Joint Light, 62 D Roots Joint Light, 65 D Joint Cracked, Quadrant 4, dye test positive 69 D Joint Cracked, Quadrant 1, dye test positive 74 D Connectn Abandoned C, active I&I 74 D Roots Joint Light, 76 D Connectn Abandoned C, 80 D Connectn Abandoned C, I&I staining 80 D Roots Joint Light, 82 D Connection Factory C, 85 D Connection Factory C, 88 D Connection Factory L, 89 D Roots Joint Light, 92 D Connection Factory L, file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] 121 D Inspection End US, LINE SEGMENT: (11)9394 - (11)15080 Televised: 4/24/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 3 Pipe Material: other Tape: 22 Tape Start: 000 Tape Stop: 1049 Total Footage: 77 Surface Condition: Other Crew: lk ,jw ,pk Location: Linden Dr Comments: Total Points: 0 26 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 FOOTAGE U/D OBSERVATIONS 1 U Inspection Begin DS, 52 U Manhole Buried, MH15080 No dye test 85 U Inspection End DS, LINE SEGMENT: (11)9449 - (11)15081 file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Televised: 4/23/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 3 Pipe Material: pvc Tape: 20 Tape Start: Tape Stop: Total Footage: 129 Surface Condition: Crew: jw ,lk , Location: Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 0 D Inspection Begin US, 20 D Connectn Break-In R, Quadrant 1, 41 D Connectn Break-In L, Quadrant 4, 79 D Connectn Break-In L, Quadrant 4, 85 D Connectn Break-In R, Quadrant 1, 110 D Inspection End US, MH 9449 LINE SEGMENT: (11)9470 - (11)9472 Televised: 4/10/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 6 Pipe Material: pvc Tape: 16 Tape Start: 000 Tape Stop: 620 Total Footage: 71 Surface Condition: Street (Paved) Crew: lkp,kng, Location: south blvd & kansas st Comments: file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Total Points: 0 FOOTAGE U/D OBSERVATIONS 0 U Inspection Begin DS, 71 U Inspection End DS, just outside of MH dye test negative LINE SEGMENT: (11)9825 - (11)9818 Televised: 4/22/02 Review Date: 1/1/00 Pipe Dia: 8 Invert Depth: 11.3 Pipe Material: vcp Tape: 19 Tape Start: 000 Tape Stop: 2041 Total Footage: 134 Surface Condition: Front Yard Crew: lk ,kl ,es Location: primrose Comments: Total Points: 0 FOOTAGE U/D OBSERVATIONS 0 U Inspection Begin DS, 5 U Connectn Abandoned L, Quadrant 4, 6 U Joint Cracked, 7 U Connectn Abandoned R, Quadrant 1, 9 U Root Joint Medium, 11 U Connectn Break-In L, Quadrant 4, 14 U file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM] Root Joint Medium, 27 Jefferson City, MO - SSES Page# 9:45:54 AM Wednesday, September 04, 2002 19 U Root Joint Medium, 20 U Crack Longitudinal, Quadrant 2, 29 U Joint Cracked, Quadrant 3, dye test positive 34 U Joint Infil Heavy, 39 U Crack Multiple, Quadrant 2, at joint with roots 49 U Roots Joint Light, 64 U Roots Joint Light, 105 U Roots Joint Heavy, 114 U Pipe Change to PVC, old repair settled out 131 U Inspection End DS, 58 of 58 Lines with Footage of 10704 ft. file:///D|/AppendixG/TVinsprpt.txt[12/4/2013 3:43:07 PM]