Loading...
HomeMy Public PortalAbout12611O R D I N A N C E NO. 12611 AN ORDINANCE, transferring funds by returning Fifty Thousand Dollars ($50,000.00) as appropriated by Ordinance No. 11014, adopted July 12, 2001 for the Lower Meramec River WWTP Site Preparation (95066E) to the Sanitary Replacement Fund balance, and appropriating Fifty Thousand Dollars ($50,000.00) from the Sanitary Replacement Fund to be used for additional engineering services during the construction of the Lower Meramec River Wastewater System Improvements Baumgartner Interceptor Tunnel and Lift Station (E-898-13 & 95066B); in unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 13 of Contract E-898 with Horner and Shifrin, Inc. for the aforesaid additional engineering services. WHEREAS, Ordinance No. 10460, adopted November 12, 1998, appropriated the initial funding for and authorized Contract E-898, and WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Fifty Thousand Dollars ($50,000.00) is hereby transferred from funds as appropriated by Ordinance No. 11014, adopted July 12, 2001, for the Lower Meramec River WWTP Site Preparation (95066E) to the Sanitary Replacement Fund balance, and the sum of Fifty Thousand Dollars ($50,000.00) is hereby appropriated from the Sanitary Replacement Fund to be used for additional engineering services during the construction of the Lower Meramec River Wastewater System Improvements Baumgartner Interceptor Tunnel and Lift Station (E-898-13 & 95066B), in unincorporated St. Louis County, Missouri. Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 13 of Contract E-898 with Horner and Shifrin, Inc. for additional engineering services during the construction of the Lower Meramec River Wastewater System Improvements Baumgartner Interceptor Tunnel and Lift Station (E-898-13 & 95066B); said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted April 10, 2008.