HomeMy Public PortalAbout12769O R D I N A N C E NO. 12769
AN ORDINANCE, appropriating One Hundred Sixty-nine
Thousand Dollars ($169,000.00) from the Sanitary Replacement Fund for
engineering services for the design study of Bissell Point WWTP Chimney
Repairs Phase II (E-1243 & 2005097A) and authorizing the Executive
Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis
Sewer District to enter into Contract E-1243 with CDG Engineers Architects
Planners, Inc. for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the
obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of One Hundred Sixty-nine Thousand
Dollars ($169,000.00) is hereby appropriated from the Sanitary
Replacement Fund for the design study of Bissell Point WWTP Chimney
Repairs Phase II (E-1243 & 2005097A).
Section Two. The Executive Director and Secretary-Treasurer
are hereby authorized on behalf of The Metropolitan St. Louis Sewer
District to enter into Contract E-1243 with CDG Engineers Architects
Planners, Inc. for the design study of Bissell Point WWTP Chimney Repairs
Phase II (E-1243 & 2005097A); said contract to be comprised of such terms
and conditions as are approved by the office of the General Counsel of
the District.
Section Three. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted November 13, 2008.