Loading...
HomeMy Public PortalAbout12787O R D I N A N C E NO. 12787 AN ORDINANCE, appropriating One Million Dollars ($1,000,000.00) from the Sanitary Replacement Fund for engineering services for the final design of RDP Foulwater Interceptor Rehabilitation (2007054) and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1247 with Horner & Shifrin Inc. for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-referenced fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of One Million Dollars ($1,000,000.00) is hereby appropriated from the Sanitary Replacement Fund for engineering services for the final design of RDP Foulwater Interceptor Rehabilitation (2007054). Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1247 with Horner & Shifrin Inc. for engineering services for the final design of RDP Foulwater Interceptor Rehabilitation (2007054); said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted December 11, 2008.