HomeMy Public PortalAbout12787O R D I N A N C E NO. 12787
AN ORDINANCE, appropriating One Million Dollars
($1,000,000.00) from the Sanitary Replacement Fund for engineering
services for the final design of RDP Foulwater Interceptor Rehabilitation
(2007054) and authorizing the Executive Director and Secretary-Treasurer
on behalf of The Metropolitan St. Louis Sewer District to enter into Contract
E-1247 with Horner & Shifrin Inc. for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-referenced fund sufficient to pay
the obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of One Million Dollars ($1,000,000.00) is
hereby appropriated from the Sanitary Replacement Fund for engineering
services for the final design of RDP Foulwater Interceptor Rehabilitation
(2007054).
Section Two. The Executive Director and Secretary-Treasurer
are hereby authorized on behalf of The Metropolitan St. Louis Sewer
District to enter into Contract E-1247 with Horner & Shifrin Inc. for
engineering services for the final design of RDP Foulwater Interceptor
Rehabilitation (2007054); said contract to be comprised of such terms and
conditions as are approved by the office of the General Counsel of the
District.
Section Three. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted December 11, 2008.