HomeMy Public PortalAbout12965ORDINANCE NO. 12965
AN ORDINANCE, appropriating Three Hundred Ten Thousand Dollars
($310,000.00) from the Sanitary Replacement Fund for engineering services for the final design
of CSO - South County Park Subsystem No. 71 Interceptor (I-161) Separation (E-1261 &
2003077D) and authorizing the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter in Contract E-1261 with HNTB Corporation for
the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an unencumbered
balance in the above-named fund sufficient to pay the obligation authorized herein.
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Three Hundred Ten Thousand Dollars ($310,000.00) is
hereby appropriated from the Sanitary Replacement Fund for engineering services for the final
design of CSO - South County Park Subsystem No. 71 Interceptor (I-161) Separation (E-1261 &
2003077D).
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1261
with HNTB Corporation for engineering services for the final design of CSO - South County
Park Subsystem No. 71 Interceptor (I-161) Separation (E-1261 & 2003077D); said contract to be
comprised of such terms and conditions as are approved by the Office of the General counsel of
the District.
Section Three. This ordinance, being an appropriation ordinance, shall take effect
immediately upon its enactment.
The foregoing Ordinance was adopted October 8, 2009.