HomeMy Public PortalAbout13151ORDINANCE NO. 13151
AN ORDINANCE, appropriating One Hundred Fifty Four Thousand Dollars
($154,000.00) from the Sanitary Replacement Fund for engineering services for the final design
of Duchesne Parque No. 1 Pump Station Elimination (P-407) (10335) and authorizing the
Executive Director and Secretary–Treasurer on behalf of The Metropolitan St. Louis Sewer
District to enter in Contract 10531 with CMV-Cochran, LLC for the aforesaid engineering
services.
WHEREAS, the Director of Finance has certified that there is an unencumbered
balance in the above-named fund sufficient to pay the obligation authorized herein.
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of One Hundred Fifty Four Thousand Dollars
($154,000.00) is hereby appropriated from the Sanitary Replacement Fund for engineering
services for the final design of Duchesne Parque No. 1 Pump Station Elimination (P-407)
(10335).
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract 10531
with CMV-Cochran, LLC for engineering services for the final design of Duchesne Parque No. 1
Pump Station Elimination (P-407) (10335); said contract to be comprised of such terms and
conditions as are approved by the Office of the General counsel of the District.
Section Three. This ordinance, being an appropriation ordinance, shall take effect
immediately upon its enactment.
The foregoing Ordinance was adopted November 10, 2010.