HomeMy Public PortalAbout13154ORDINANCE NO. 13154
AN ORDINANCE, appropriating Four Hundred Five Thousand Dollars
($405,000.00) from the Operation, Maintenance and Construction Improvement Fund of Black
Creek for engineering services for the final design of Ridgemoor Drive Storm Improvements and
I/I Reduction (SKME-574) (10390); and authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract 10535
with Bernardin, Lochmueller and Associates, Inc. for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an unencumbered
balance in the above-named fund sufficient to pay the obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Four Hundred Five Thousand Dollars ($405,000.00) is
hereby appropriated from the Operation, Maintenance and Construction Improvement Fund of
Black Creek for engineering services for the final design of Ridgemoor Drive Storm
Improvements and I/I Reduction (SKME-574) (10390).
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract 10535
with Bernardin, Lochmueller and Associates, Inc. for engineering services for the final design of
Ridgemoor Drive Storm Improvements and I/I Reduction (SKME-574) (10390); said contract to
be comprised of such terms and conditions as are approved by the Office of the General Counsel
of the District.
Section Three. This ordinance, being an appropriation ordinance, shall take effect
immediately upon its enactment.
The foregoing Ordinance was adopted November 10, 2010.