Loading...
HomeMy Public PortalAbout13281ORDINANCE NO. 13281 AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 10678 with M3 Engineering Group, P.C. for CSO Volume Reduction - Green Infrastructure (Pilot Program) (11048) for engineering services, including design, geotechnical investigation, planting plan, and other engineering services. BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The Executive Director and Secretary-Treasurer are hereby authorized to enter into Contract No. 10678 with M3 Engineering Group, P.C. for CSO Volume Reduction - Green Infrastructure (Pilot Program) (11048) for engineering services, including design, geotechnical investigation, planting plan, and other engineering services; said contract shall provide for a fee not to exceed One Hundred Fifty Thousand Dollars ($150,000.00), and shall be comprised of such other terms and conditions as are approved by the Office of the General Counsel of the District. Section Two. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted August 11, 2011.