HomeMy Public PortalAbout13394ORDINANCE NO. 13394
AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer
on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Landesign,
LLC for the construction of Green Infrastructure Bioretention at Clinton St. #1323 Bioretention
(CB632) - CSO VR GIPLT (11157) in the City of St. Louis, Missouri.
WHEREAS, Ordinance No. 13129, adopted September 16, 2010 appropriated the
funding for this green infrastructure project,
NOW THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with
Landesign, LLC for the construction of Green Infrastructure Bioretention at Clinton St. #1323
Bioretention (CB632) - CSO VR GIPLT (11157) in the City of St. Louis, Missouri, pursuant to
bids received and opened on the 16th day of April, 2012.
Section Two. The contract authorized in Section One of this Ordinance shall
provide for a fee not to exceed Two Hundred Thousand Dollars ($200,000.00), and shall be
comprised of such other terms and conditions as are approved by the Office of the General
Counsel.
The foregoing Ordinance was adopted June 14, 2012.