Loading...
HomeMy Public PortalAbout13468ORDINANCE NO. 13468 AN ORDINANCE, appropriating One Hundred Twenty Five Thousand Dollars ($125,000.00) from the Sanitary Replacement Fund to be used for project costs for the construction of storm sewers in Blancha Dr. to Olive Blvd. Sewer Separation (10393), in the City of University City, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Pangea Engineering and Surveying LLC for the aforesaid storm sewer construction. WHEREAS, the bid for said storm sewer construction is One Hundred Seventy Five Thousand Six Hundred Two and 21/100 Dollars ($175,602.21) and the allowance for construction change orders and other project expenses is Forty Nine Thousand Three Hundred Ninety Seven and 79/100 Dollars ($49,397.79). WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of One Hundred Twenty Five Thousand Dollars ($125,000.00) is hereby appropriated from the Sanitary Replacement Fund to be used for project costs for the construction of storm sewers in Blancha Dr. to Olive Blvd. Sewer Separation (10393), in the City of University City, Missouri. Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Pangea Engineering and Surveying LLC as the lowest responsible bidder for the construction of storm sewers in Blancha Dr. to Olive Blvd. Sewer Separation (10393), in the City of University City, Missouri, pursuant to bids received and opened on the 17th day of July, 2012. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted September 27, 2012.