HomeMy Public PortalAbout13542ORDINANCE NO. 13542
AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer
on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with
XL Contracting, Inc. for the construction of Green Infrastructure Bioretention at Geraldine
#5099 & Beacon #5479 Bioretention (CB5087 & 5528) CSO VR GIPLT (11802) in the City of
St. Louis, Missouri.
WHEREAS, Ordinance No. 13129, adopted September 16, 2010 appropriated the
funding for this green infrastructure project,
NOW THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with
XL Contracting, Inc. for the construction of Green Infrastructure Bioretention at Geraldine
#5099 & Beacon #5479 Bioretention (CB5087 & 5528) CSO VR GIPLT (11802) in the City of
St. Louis, Missouri, pursuant to bids received and opened on the 8th day of November, 2012.
Section Two. The contract authorized in Section One of this Ordinance shall
provide for a fee not to exceed Two Hundred Forty Thousand Dollars ($240,000.00), and shall
be comprised of such other terms and conditions as are approved by the Office of the General
Counsel.
The foregoing Ordinance was adopted on January 10, 2013.