HomeMy Public PortalAbout13656ORDINANCE NO. 13656
AN ORDINANCE, making an appropriation of Forty Seven Thousand Dollars
($47,000.00) from the Sanitary Replacement Fund for engineering services for the design of
Bissell-Coldwater-Missouri-Meramec Public I/I Reduction (2016) Contract B (11924) and
authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St.
Louis Sewer District to amend Contract No. 11011 with AMEC Environment & Infrastructure,
Inc., for the aforesaid engineering services.
WHEREAS, Ordinance No. 13497 adopted October 11, 2012, appropriated the
initial funding for and authorized Contract No. 11011, and
WHEREAS, the Director of Finance has certified that there is an unencumbered
balance in the above-named fund sufficient to pay the obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Forty Seven Thousand Dollars ($47,000.00) is hereby
appropriated from the Sanitary Replacement Fund for engineering services for the design of
Bissell-Coldwater-Missouri-Meramec Public I/I Reduction (2016) Contract B (11924).
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to amend Contract No. 11011
with AMEC Environment & Infrastructure, Inc., for engineering services for the design of
Bissell-Coldwater-Missouri-Meramec Public I/I Reduction (2016) Contract B (11924); said
contract being comprised of such terms and conditions as have been approved by the Office of
the General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance, shall take effect
immediately upon its enactment.
The foregoing Ordinance was adopted on August 8, 2013.