HomeMy Public PortalAbout13677ORDINANCE NO. 13677
AN ORDINANCE, making an appropriation of Six Hundred Fifty Four Thousand
Dollars ($654,000.00) from the Sanitary Replacement Fund for engineering services for the
design of Ballas Road Subtrunk South I/I Reduction (11682) and authorizing the Executive
Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to
amend Contract No. 10733 with Parsons Water & Infrastructure, Inc., for the aforesaid
engineering services.
WHEREAS, Ordinance No. 13366 adopted February 9, 2012, appropriated the
initial funding for and authorized Contract No. 10733, and
WHEREAS, the Director of Finance has certified that there is an unencumbered
balance in the above-named fund sufficient to pay the obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Six Hundred Fifty Four Thousand Dollars
($654,000.00) is hereby appropriated from the Sanitary Replacement Fund for engineering
services for the design of Ballas Road Subtrunk South I/I Reduction (11682).
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to amend Contract No. 10733
with Parsons Water & Infrastructure, Inc., for engineering services for the design of Ballas Road
Subtrunk South I/I Reduction (11682); said contract being comprised of such terms and
conditions as have been approved by the Office of the General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance, shall take effect
immediately upon its enactment.
The foregoing Ordinance was adopted on August 8, 2013.