Loading...
HomeMy Public PortalAbout13704ORDINANCE NO. 13704 AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20051 with Two Alpha Contracting, LLC for the construction of Green Infrastructure Bioretention at Warne #4241 Bioretention (CB 4899) CSO VR GIPLT (11804) in the City of St. Louis, Missouri. WHEREAS, Ordinance No. 13129, adopted September 16, 2010 appropriated the funding for this green infrastructure project, NOW THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20051 with Two Alpha Contracting, LLC for the construction of Green Infrastructure Bioretention at Warne #4241 Bioretention (CB 4899) CSO VR GIPLT (11804) in the City of St. Louis, Missouri, pursuant to bids received and opened on the 4th day of June 2013. Section Two. The contract authorized in Section One of this Ordinance shall provide for a fee not to exceed Eighty One Thousand Five Hundred Dollars ($81,500.00), and shall be comprised of such other terms and conditions as are approved by the Office of the General Counsel. The foregoing Ordinance was adopted on July 11, 2013.