HomeMy Public PortalAbout13742ORDINANCE NO. 13742
AN ORDINANCE, appropriating Five Hundred Sixty Nine Thousand One
Hundred Forty-Four Dollars ($569,144.00) from the General Fund of the District to continue the
operation and maintenance of water quality sampling and analysis in Stream Flow Water Quality
Sampling (FY2014) (11916); and authorizing the Executive Director and Secretary-Treasurer on
behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20087 with the
Geosyntec Consultants, Inc. for the aforesaid services.
WHEREAS, said contract provides for an initial term of one (1) year with an
additional two (2) year option to renew annually based on performance and Board Approval, and
WHEREAS, the Director of Finance has certified that there is an unencumbered
balance in the above-named fund sufficient to pay the obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Five Hundred Sixty Nine Thousand One Hundred
Forty-Four Dollars ($569,144.00) is hereby appropriated from the General Fund of the District to
continue the operation and maintenance of water quality sampling and analysis in Stream Flow
Water Quality Sampling (FY2014) (11916).
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract
No. 20087 with Geosyntec Consultants, Inc. for the operation and maintenance of water quality
sampling and analysis in Stream Flow Water Quality Sampling (FY2014) (11916); said contract
to be comprised of such terms and conditions as are approved by the Office of the General
Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance, shall take effect
immediately upon its enactment.
The foregoing Ordinance was adopted on November 14, 2013.