HomeMy Public PortalAbout13771ORDINANCE NO. 13771
AN ORDINANCE, appropriating One Hundred Fifty Thousand Dollars
($150,000.00) from the Operation, Maintenance and Construction Improvement Fund of
Coldwater Creek for engineering services for the design of Coldwater Creek OMCI Stormwater
Design (Contract D) (11906); and authorizing the Executive Director and Secretary-Treasurer on
behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20115 with
Farnsworth Group, Inc. for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an unencumbered
balance in the above-named fund sufficient to pay the obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of One Hundred Fifty Thousand Dollars ($150,000.00) is
hereby appropriated from the Operation, Maintenance and Construction Improvement Fund of
Coldwater Creek for engineering services for the design of Coldwater Creek OMCI Stormwater
Design (Contract D) (11906).
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract
No. 20115 with Farnsworth Group, Inc. for engineering services for the design of Coldwater
Creek OMCI Stormwater Design (Contract D) (11906); said contract to be comprised of such
terms and conditions as are approved by the Office of the General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance, shall take effect
immediately upon its enactment.
The foregoing Ordinance was adopted on January 9, 2014.