HomeMy Public PortalAbout13774ORDINANCE NO. 13774
AN ORDINANCE, appropriating Two Hundred Ten Thousand Dollars
($210,000.00) from the Operation, Maintenance and Construction Improvement Fund of
Coldwater Creek for engineering services for the design of Coldwater Creek OMCI Stormwater
Design (Contract G) (11938); and authorizing the Executive Director and Secretary-Treasurer on
behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20118 with ILINC
Engineering Incorporated for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an unencumbered
balance in the above-named fund sufficient to pay the obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Two Hundred Ten Thousand Dollars ($210,000.00) is
hereby appropriated from the Operation, Maintenance and Construction Improvement Fund of
Coldwater Creek for engineering services for the design of Coldwater Creek OMCI Stormwater
Design (Contract G) (11938).
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract
No. 20118 with ILINC Engineering Incorporated for engineering services for the design of
Coldwater Creek OMCI Stormwater Design (Contract G) (11938); said contract to be comprised
of such terms and conditions as are approved by the Office of the General Counsel of the
District.
Section Three. This ordinance, being an appropriation ordinance, shall take effect
immediately upon its enactment.
The foregoing Ordinance was adopted on January 9, 2014.