Loading...
HomeMy Public PortalAbout14054 Marietta Dr Storm Separation and I/I Reduction BP292 11659ORDINANCE NO. 14054 AN ORDINANCE, appropriating Eight Hundred Fifty Thousand Dollars ($850,000.00) from the Sanitary Replacement Fund to be used for private I/I removal at Marietta Dr Storm Separation and I/I Reduction (BP-292) (11659), in the City of Normandy, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20241 with J. H. Berra Construction Co., Inc. for the aforesaid private I/I removal. WHEREAS, the bid for the sanitary sewer construction is Six Hundred Twenty- Eight Thousand Seven Hundred Twenty-Seven Dollars ($628,727.00) and the allowance for change orders and other project costs is Two Hundred Twenty-One Thousand Two Hundred Seventy-Three Dollars ($221,273.00), and WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Eight Hundred Fifty Thousand Dollars ($850,000.00) is hereby appropriated from the Sanitary Replacement Fund to be used for private I/I removal at Marietta Dr Storm Separation and I/I Reduction (BP-292) (11659), in the City of Normandy, Missouri. Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20241 with J. H. Berra Construction Co., Inc. as the lowest responsible bidder for the private I/I removal at Marietta Dr Storm Separation and I/I Reduction (BP-292) (11659), in the City of Normandy, Missouri, pursuant to bids received and opened on the 21st day of January 2015. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted on March 12, 2015.