Loading...
HomeMy Public PortalAbout14321 Rain & Flood Event Emergency Response & Recovery Initial AppropriationORDINANCE NO. 14321 AN ORDINANCE, appropriating Ten Million Dollars ($10,000,000.00) from the General Fund to be used for emergency construction, repair, replacement, rehabilitation, design and construction management costs associated with the December 2015 Rain and Flood Event Emergency Response and Recovery (12732) at the Fenton Wastewater Treatment Plant, the Grand Glaize Wastewater Treatment Plant, the Grand Glaize Maintenance Facility, the Missouri River Wastewater Treatment Plant, and various facilities, pump stations and collection system piping throughout the Metropolitan Sewer District Service Area. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, and NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Ten Million Dollars ($10,000,000.00) is hereby appropriated from the General Fund for emergency construction, repair, replacement, rehabilitation, design and construction management costs associated with the December 2015 Rain and Flood Event Emergency Response and Recovery (12732) at the Fenton Wastewater Treatment Plant, the Grand Glaize Wastewater Treatment Plant, the Grand Glaize Maintenance Facility, the Missouri River Wastewater Treatment Plant, and various facilities, pump stations and collection system piping throughout the Metropolitan Sewer District Service Area. Section Two. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing ordinance was adopted on January 14, 2016.