HomeMy Public PortalAbout14564 Stormwater Streambank Stabilization Design (Contract A) (12686)ORDINANCE NO. 14564
AN ORDINANCE, appropriating One Million Two Hundred Thousand Dollars
($1,200,000.00) from the Districtwide Stormwater Fund to be used for design in Stormwater
Streambank Stabilization Design (Contract A) (12686) in the Cities of Des Peres, Northwoods,
Normandy, and Unincorporated St. Louis County, Missouri; and authorizing the Executive
Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract No. 20514 with Access Engineering, LLC for design services.
WHEREAS, the Director of Finance has certified that there is an unencumbered
balance in the above-named fund sufficient to pay the obligation authorized herein.
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of One Million Two Hundred Thousand Dollars
($1,200,000.00) is hereby appropriated from the Districtwide Stormwater Fund for design in
Stormwater Streambank Stabilization Design (Contract A) (12686) in the Cities of Des Peres,
Northwoods, Normandy, and Unincorporated St. Louis County, Missouri.
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract
No. 20514 with Access Engineering, LLC for design in Stormwater Streambank Stabilization
Design (Contract A) (12686) in the Cities of Des Peres, Northwoods, Normandy, and
Unincorporated St. Louis County, Missouri.
Section Three. This ordinance, being an appropriation ordinance, shall take effect
immediately upon its enactment.
The foregoing ordinance was adopted on December 8, 2016