Loading...
HomeMy Public PortalAbout14565 Stormwater Streambank Stabilization Design (Contract B) (12687)ORDINANCE NO. 14565 AN ORDINANCE, appropriating One Million Two Hundred Thousand Dollars ($1,200,000.00) from the Districtwide Stormwater Fund to be used for design in Stormwater Streambank Stabilization Design (Contract B) (12687) in the Cities of Ballwin, Chesterfield, Clarkson Valley, Manchester, Town and Country, and Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20515 with M3 Engineering Group, PC for design services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of One Million Two Hundred Thousand Dollars ($1,200,000.00) is hereby appropriated from the Districtwide Stormwater Fund for design in Stormwater Streambank Stabilization Design (Contract B) (12687) in the Cities of Ballwin, Chesterfield, Clarkson Valley, Manchester, Town and Country, and Unincorporated St. Louis County, Missouri. Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20515 with M3 Engineering Group, PC for design in Stormwater Streambank Stabilization Design (Contract B) (12687) in the Cities of Ballwin, Chesterfield, Clarkson Valley, Manchester, Town and Country, and Unincorporated St. Louis County, Missouri. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing ordinance was adopted on December 8, 2016