HomeMy Public PortalAbout14626 CSO Volume Reduction Green Infrastructure -Union Station Sustainable Stormwater Improvements (12664)ORDINANCE NO. 14626
AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer
on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with USH,
LLC for cost sharing in CSO Volume Reduction Green Infrastructure – Union Station
Sustainable Stormwater Improvements (12664) in the City of St. Louis, Missouri.
WHEREAS, Ordinance No. 13129, adopted September 16, 2010, authorized the
original appropriation for green infrastructure construction in the CSO Volume Reduction Green
Infrastructure (11146); and
WHEREAS, Ordinance No. 14193, adopted on September 10, 2015, appropriated
the funding for this Green Infrastructure Project.
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement
with USH, LLC for cost sharing in CSO Volume Reduction Green Infrastructure – Union Station
Sustainable Stormwater Improvements (12664) in the City of St. Louis, Missouri; said agreement
shall provide for a fee not to exceed One Million Nine Hundred Thousand Dollars
($1,900,000.00) from the General Fund and shall be comprised of such other terms and
conditions as are approved by the Office of the General Counsel of the District.
The foregoing ordinance was adopted on April 13, 2017.