Loading...
HomeMy Public PortalAbout14647 Surburban II Reduction (Harrison Dr and Suburban Ave) (12222)ORDINANCE NO. 14647 AN ORDINANCE, appropriating Five Hundred Sixty-Nine Thousand Dollars ($569,000.00) from the Sanitary Replacement Fund and Two Hundred Sixty-One Thousand Dollars ($261,000.00) from the Operation, Maintenance, Construction, and Improvement Fund of Maline Creek to be used for storm sewer construction and private I/I removal in Suburban I/I Reduction (Harrison Dr and Suburban Ave) (12222) in the City of Ferguson, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20581 with Pangea, Inc. dba Pangea Group for the aforesaid storm sewer construction and private I/I removal. WHEREAS, the bid for said storm sewer construction and private I/I removal is Six Hundred Sixteen Thousand Eight Hundred Thirty-Six and 08/100 Dollars ($616,836.08) and the allowance for construction change orders and other project expenses is Two Hundred Thirteen Thousand One Hundred Sixty-Three and 92/100 Dollars ($213,163.92); and WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Five Hundred Sixty-Nine Thousand Dollars ($569,000.00) is hereby appropriated from the Sanitary Replacement Fund and the sum of Two Hundred Sixty-One Thousand Dollars ($261,000.00) is hereby appropriated from the Operation, Maintenance, Construction, and Improvement Fund of Maline Creek for storm sewer construction and private I/I removal in Suburban I/I Reduction (Harrison Dr and Suburban Ave) (12222) in the City of Ferguson, Missouri. Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20581 with Pangea, Inc. dba Pangea Group, as the lowest responsible bidder for storm sewer construction and private I/I removal in Suburban I/I Reduction (Harrison Dr and Suburban Ave) (12222) in the City of Ferguson, Missouri, pursuant to bids received on the 7th day of March, 2017. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted on May 11, 2017.