HomeMy Public PortalAbout14804 CSO Volume Reduction Green Infrastructure - Shriners Building 700-728 S Euclid (12933)ORDINANCE NO. 14804
AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer
on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with BBOB,
LLC for cost sharing for green infrastructure construction in CSO Volume Reduction Green
Infrastructure – Shriner’s Building 700-728 S. Euclid (12933) in the City of St. Louis, Missouri.
WHEREAS, Ordinance No. 14629, adopted April 13, 2017, authorized the
appropriation for green infrastructure construction in the CSO Volume Reduction Green
Infrastructure (11146).
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement
with BBOB, LLC for cost sharing for green infrastructure construction in CSO Volume
Reduction Green Infrastructure – Shriner’s Building 700-728 S. Euclid (12933) in the City of
St. Louis, Missouri; said agreement shall provide for a fee not to exceed Thirty-Two Thousand
Four Hundred Dollars ($32,400.00) from the General Fund and shall be comprised of such other
terms and conditions as are approved by the Office of the General Counsel of the District.
The foregoing ordinance was adopted on November 9, 2017.