No. #24-45 Date of Moulton February 8, 2024
AUTHORIZING EMERGENCY SEWER REPAIRS
B & W CONSTRUCTION COMPANY
WHEREAS, the Borough of Carteret ("Borough") is in need of sewer repairs in various
locations within the Borough; and
WHEREAS, the Borough's Director of Engineering has certified that said work needed
to be done as an emergency condition threatening the public health, safety, and welfare of
the residents; and
WHEREAS, the Borough Director of Engineering has recommended an award of a
contract to B & W Construction Company to perform emergency repairs to these various
locations within the Borough; and
WHEREAS, B & W Construction Company presently has an existing contract with the
Borough to pet -form emergency repairs to the Borough sewer system.
NOW, THEREFORE, BE IT RESOLVED, by the Mayor and Council of the Borough
of Carteret, County of Middlesex, State of New Jersey, as follows:
1. The appropriate Borough Officials are authorized and directed to
enter into a contract for emergency repairs within the Borough, as
recommended by the Borough's Director of Engineering, in a total
amount not to exceed $25,000.00 in accordance with B & W
Construction Company's existing contract with the Borough.
2. That this award is made as an emergency contract.
3. That this award is contingent upon the ability of funds for said
repairs.
4. That a copy of this Resolution be forwarded to the Borough's
Director of Engineering, Purchasing Department and B & W
Construction, Company.
Adopted this 81h day of February, 2024
and certified as a true copy of the
original on February 9, 2024.
CARMELA POGORZELSICI
Acting Municipal Clerk
RECORD OF COUNCIL VOTE
COUNCILMAN
YES
NO
NV
A.B.
COUNCILMAN
YES
NO
NV
A.B.
BELLINO
X
JOHAL
X
DIAZ
X
KRUM
X
DIMASCIO
X
NAPLES
X
X- Indicate Vote An - Absent NV - Not Voting XOR- Indicates Vote to Overmle Veto
Adopted at a meeting of the Municipal Council
February 8,
ICI L C K
2024
BOROUGH Or, CABTERET Davie#
MUN1CIP&L CLERK
Data: robytin $, =
To: Pnh•lok DOBIHalo
'fransuror
Borough of CHrlol'ct
j11301UISTPORC$R'11, 9 'I'IONOIfAVA14A131liPtlNl S
ResolutlonNtU24n-I #-,,2 _ - `')
Nnnla of Aecotu:l:, B 8zW CONS7'RUOTION COMPANY
AMOUNT TO RH IMCUMRRRM AMOUNTNOTIQ BXCIi 00 0 !
Munlolpnl Clerk
CLrR'fIpICATm OF AVAILABILITY OF FUNDS
I' Doaaaror of lho Borough of Cnrleral, do ho:eby oorilty that lhoro lira aufflolout hinds nvelinblo In Ilia ourfont
budget to ounbla ilia Muutolpnl Counall to ra:ihorizo tha ontoring into it Conlrnol botweou the Borough of Cnrtorot
and;
{}vJ Lor.A'nj A;mn1
Tito 4ulds uvnllnblo for tills ooldroat ilro III Ilia Bohol, III file noomild a@
C_oL.. n-Lo1 —laI
11) Ilia nnlolllit
By this oortlOentlnu, I hnvo horoby onounlbored tho nt:ovo nnnlod aaoaollt for the Hill ao�af tho o�mDgra Irol ng��y, _may,
Conuollaollou, /n/IMC �A `ram
• Potriok 17aBinsio
• 71•anauror
Data:
Melnorin( Mnnlcipul lSltil<Xing 0 GX Coolrc •A.vemte # Cnrtevett mewlersey O700g
'�'e1:732�5d1••;it1g0 q 1PH)ct 79z••541.-ts92G � �I'1sllii e�.(acarleae
• wwwcnrfereh,neE
B & W Construction Co. of NJ Inc.
P.O. Box 674 Phone 732-967-1900
South River, NJ 08862 Fax 732-967-6330
October 10, 2023
Borough of Carteret
Department of Engineering
61 Cooke Avenue
Carteret, New Jersey 07008
Attn: Mr. John DuPont, PE
Director of Engineering
REQUISITION #011-23
Pagel of 3
1. Operator
-
7
Hrs.
@
350.00
V 1HL
2,4501.00
2. 305 Excavator
7
Hrs.
@
.01
.07
3. #216 Dump w/driv
7
Hrs.
@
.01
4. #239 Dump w/driv
7
Hrs.
@
.01
.07
.07
5. Laborer
7
Hrs,
@
.01
.07
6. 4207 Utility Truck
7
Hrs.
@
299.00
2,093.00
7. #226 Rack Truck
7
Hrs.
@
800.00
5,600.00
S. Air Compressor
7
Hrs.
@
.01
.07
9. 2" Pump
7
Hrs.
@
.01
.07
10 Steel Plates (2)
14
Hrs.
@
5.00
70.00
MATERIALS
A. Dispose Asphalt/Con
6.23
CY
@
.01
.06
B. Dispose Excavation
.5 Single
Lds
@
200.00 +5%
105.00
C.'/" Clean Stone
4
Tons
@
30.00
120.00
D. 8" Concrete Slab
1
EA
@
443.03 +5%
465.18
9/12/23
1. Operator
7
Hrs.
@
350,00
2,450,00
2. 305 Excavator
7
Hrs.
@
.01
07
3. 4216 Dump w/driv
7
Hrs,
@
.01
.07
4, #239 Dump w/driv
7
Hrs.
@
.01
.07
5. Laborer
7
Hrs.
@
01
07
6. #207 Utility Truck
7
Hrs.
@
299.00
2,093.00
7. #226 Rack Truck
7
Hrs.
@
800.00
5,600.00
8. Air Compressor
7
Hrs.
@
.01
.07
9. 2" Pump
7
Hrs,
@
.01
.07
10 Policeman
7
Hrs.
@
109.00
763.00
B & W Construction Co. of NJ Inc.
P.O. Box 574
South River, NJ 08882 Phone 732-967-1900
Fax 732-967-6330
Page 2 of 3
i I Steel Plates (2)
14
Hrs,
@
5.00
MATERIALS
70.00
A. 8" PVC Pipe
B. 8"Ferncos
12
LF
@
10.54
+5%
132.80
C. MH Barrel Block
4
26
EA
EA
@
@
24.18
4.25
+5%
101.56
D. Concrete Brick
20
EA
@
+5%
116.03
F. Quickcrete
7
Bags
@
•65
8.47
+5%
+5%
13.65
G. MH Flat Top
I
EA
@
457.57
+5%
62.25
480.45
H.'/" Clean Stone
3
Tons
@
30.00
120.00
1. Concrete
9/13/23
I
CX
@
142.00
+5%
149.10
L Operator
2. 305 Excavator
6
6
Hrs.
@
350.00
2100.00
3. #216 Dump w/driv
6
Hrs.
Firs.
@
@
.01
.06
4. #239 Dump w/driv
6
14rs.
@
.01
.06
5. Laborer
6
i-Ls.
@
.01
.01
.06
6. #207 Utility Truck
6
Iles•
@
299.00
.06
1,794.00
7. #226 Rack Truck
6
Hrs.
@
800.00
4,800.00
8. Air Compressor
6
Hrs.
@
MATERIALS
.01
.06
A. MH Barrel Block
7
EA
@
4.25
+5%
31.24
B. Quickcrete
C. Blend Stone
2
6
Bags
@
8.47
+5%
17.79
D.Stabilized Base
1.26
Tons
Tons
@
@
30,00
100.00
180.00
E. FABC Top Course
1.54
Tons
@
100.00
126.00
F. Tack
1
Can
@
80.00
+5%
154.00
84.00
TOTAL AMOUNT
DUE THIS INVOICE $32,343.25
B & W Construction Co. of NJ Inc.
P O Box 574
South River, NJ 08882
Phone 732-967-1900
Fax 732-967.6330
Page 3 of 3
9/11/23
Today the crew went out to the site, set up signs and cones. We had a police officer scheduled but no
Police officer showed up. We had the sewer department on site to jet the sewer pipes because the
manhole was backed up. Cut, removed and disposed of the pavement in the area around the manhole.
Excavated and removed the manhole. Dewatered the trench using a pump. Excavated 20 inches below
the lowest invert elevation. Supplied and install 3/" clean stone 12 inches thick to support the manhole.
Supplied and installed a 6'x6'x8" thick concrete slab. Cut all pipes entering the manhole. Cleaned up the
jobsite. Installed steel plated over the trench.
9/12/23
Crew went out to the site, set up signs, cones and a police officer. Removed the steel plates from over
the trench. Installed a suck tube on the side of the concrete slab so that we could dewater the trench,
Supplied and installed 8" PVC pipe onto the manhole slab. Connected the 8" PVC pipe to the existing
pipes using 8" Fernco Couplings. Constructed manhole over all (3) 8" pipes using manhole barrel block,
bricks and quickcrete cement. Poured a concrete channel inside the manhole. Supplied and installed a
manhole flat top section on top of the manhole. Cleaned up the site. Installed steel plates over the trench.
Removed all signs, cones and the police officer.
9/13/23
Today the crew went out to the site, set up signs and cones. We had a police officer scheduled but no
Police officer showed up. Removed the steel plates from the trench. Built manhole to grade using barrel
block and cement. Set manhole frame and cover to grade. Backfilled around the manhole 7 inches below
finished pavement elevation using'/a" blend stone compacting in lifts to prevent settlement.
Supplied and installed stabilized base course asphalt 5 inches thick. Supplied and installed FABC top
course asphalt 2 inches thick with tack. Cleaned up the job site. Removed all signs and cones, opened
road to through traffic. This job is complete.
NOTE: We contracted Chief McFadden prior to starting this job and scheduled a police officer for
traffic control for every day, but a police officer only showed up on 9/12/23,
Resp t yS/ itted,
Raymond Baszak
President