Loading...
HomeMy Public PortalAbout15114 Maffitt 5651-5659 & Roosevelt 5632-5636 Bioretention (CB 5202 4243) CSO VR GI (12891)ORDINANCE NO. 15114 AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 21753 with DJM Ecological Services for green infrastructure construction in Maffitt #5651-5659 & Roosevelt #5632-5636 Bioretention (CB 5202 & 4243) CSO VR GI (12891) in the City of St. Louis, Missouri. WHEREAS, Ordinance No. 14879, adopted April 12, 2018, authorized the appropriation for green infrastructure construction in the CSO Volume Reduction Green Infrastructure (11146). NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 21753 with DJM Ecological Services for green infrastructure construction in Maffitt #5651-5659 & Roosevelt #5632-5636 Bioretention (CB 5202 & 4243) CSO VR GI (12891) in the City of St. Louis, Missouri, pursuant to bids received on the 9th day of January 2019; said contract shall provide for a fee not to exceed Six Hundred Fifty Thousand Dollars ($650,000.00) from the General Fund and shall be comprised of such other terms and conditions as are approved by the Office of the General Counsel of the District. The foregoing Ordinance was adopted on March 14, 2019.