HomeMy Public PortalAbout15165 Lemay No. 3 Pump Station and Force Main 11817ORDINANCE NO. 15165
AN ORDINANCE, making a supplemental appropriation of Fifty Thousand
Dollars ($50,000.00) from the Sanitary Replacement Fund to be used for design of a pump
station in Lemay No. 3 Pump Station and Force Main (11817) in Unincorporated St. Louis
County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of
The Metropolitan St. Louis Sewer District to amend Contract No. 10734 with Jacobs
Engineering Group Inc. for the aforesaid design of a pump station.
WHEREAS, Ordinance No. 13636, adopted July 11, 2013, appropriated the initial
funding for and authorized Contract No. 10734; and
WHEREAS, the Director of Finance has certified that there is an unencumbered
balance in the above-named fund sufficient to pay the obligation authorized herein.
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Fifty Thousand Dollars ($50,000.00) is hereby
appropriated from the Sanitary Replacement Fund for design of a pump station in Lemay No. 3
Pump Station and Force Main (11817) in Unincorporated St. Louis County, Missouri.
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to amend Contract No. 10734
with Jacobs Engineering Group Inc. for design of a pump station in Lemay No. 3 Pump Station
and Force Main (11817) in Unincorporated St. Louis County, Missouri, and shall be comprised
of such other terms and conditions as are approved by the Office of the General Counsel of the
District.
Section Three. This ordinance, being an appropriation ordinance, shall take effect
immediately upon its enactment.
This foregoing Ordinance was adopted on June 13, 2019.