Loading...
HomeMy Public PortalAbout15277 Bissell Point WWTF Trickling Filter Media Replacement (12566)ORDINANCE NO. 15277 AN ORDINANCE, appropriating Eight Hundred Seven Thousand Dollars ($807,000.00) from the Sanitary Replacement Fund to be used for design of improvements in Bissell Point WWTF Trickling Filter Media Replacement (12566) in the City of St. Louis, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 21838 with Jacobs Engineering Group Inc. for the aforesaid design of improvements. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Eight Hundred Seven Thousand Dollars ($807,000.00) is hereby appropriated from the Sanitary Replacement Fund for design of improvements in Bissell Point WWTF Trickling Filter Media Replacement (12566) in the City of St. Louis, Missouri. Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 21838 with Jacobs Engineering Group Inc. for design of improvements in Bissell Point WWTF Trickling Filter Media Replacement (12566) in the City of St. Louis, Missouri; said contract being comprised of such terms and conditions as have been approved by the Office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted on October 10, 2019.