O R D I N A N C E NO. 10396
AN ORDINANCE, appropriating Eighty Thousand Dollars ($80,000.00)
from the Operation, Maintenance and Construction Improvement Fund of Maline
Creek for engineering services for the final design of Maline Creek Bank Stabilization
(98059); and authorizing the Executive Director and Secretary-Treasurer on behalf of
The Metropolitan St. Louis Sewer District to enter into Contract E-894 with CH2M Hill
for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Eighty Thousand Dollars ($80,000.00) is hereby
appropriated from the Operation, Maintenance and Construction Improvement Fund of
Maline Creek for engineering services for the final design of Maline Creek Bank
Stabilization (98059).
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into
Contract E-894 with CH 2 M Hill for engineering services for the final design of Maline
Creek Bank Stabilization (98059); said contract to be comprised of such terms and
conditions as are approved by the office of the General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance, shall
take effect immediately upon its enactment.
The foregoing Ordinance was adopted July 9, 1998.