HomeMy Public PortalAbout10410
O R D I N A N C E NO. 10410 AN ORDINANCE, appropriating Two Hundred Eighty-nine Thousand
Dollars ($289,000.00) from the Operation, Maintenance and Construction Improvement
Fund of Coldwater Creek for engineering services for the final design of Breckenridge
to Baltimore Storm Channel (96044), and authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract E-895 with ABNA Engineering, Inc. for the aforesaid engineering
services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT;
Section One. The sum of Two Hundred Eighty-nine Thousand Dollars
($289,000.00) is hereby appropriated from the Operation, Maintenance and
Construction Improvement Fund of Coldwater Creek for engineering services for the
final design of Breckenridge to Baltimore Storm Channel (96044).
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into
Contract E-895 with ABNA Engineering, Inc. for engineering services for the final
design of Breckenridge to Baltimore Storm Channel (96044); said contract to be
comprised of such terms and conditions as are approved by the office of the General
Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance, shall
take effect immediately upon its enactment.
The foregoing Ordinance was adopted August 13, 1998.