Loading...
HomeMy Public PortalAbout10510 O R D I N A N C E NO. 10510 AN ORDINANCE, appropriating a total of Two Hundred Seventy Thousand Dollars ($270,000.00), to be funded as follows: One Hundred Eighty Thousand Dollars ($180,000.00) from the Operation, Maintenance and Construction Improvement Fund of Missouri River Bonfils, and Ninety Thousand Dollars ($90,000.00) from the Operation, Maintenance and Construction Improvement Fund of Lower Meramec River Basin, for engineering services for Phase II of Missouri River Bonfils Inflow and Infiltration Correction (97040), and King George, Mayfair, and Windsor Gardens Inflow and Infiltration Correction (98036) Study; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 1 to Contract E-893 with George Butler Associates, Inc. for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The total sum of Two Hundred Seventy Thousand Dollars ($270,000.00), to be funded as follows: One Hundred Eighty Thousand Dollars ($180,000.00) from the Operation, Maintenance and Construction Improvement Fund of Missouri River Bonfils, and Ninety Thousand Dollars ($90,000.00) from the Operation, Maintenance and Construction Improvement Fund of Lower Meramec River 2 Basin, is hereby appropriated for engineering services for Phase II of Missouri River Bonfils Inflow and Infiltration Correction (97040), and King George, Mayfair, and Windsor Gardens Inflow and Infiltration Correction (98036) Study. Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 1 to Contract E-893 with George Butler Associates, Inc. for engineering services for Phase II of Missouri River Bonfils Inflow and Infiltration Correction (97040), and King George, Mayfair, and Windsor Gardens Inflow and Infiltration Correction (98036) Study; said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted January 14, 1999 by the following vote – Ayes – C. D. Seward, P.P. Finn, J.W. Siscel, and M.C. Williams. Nays – None. Secretary-Treasurer