Loading...
HomeMy Public PortalAbout10607 O R D I N A N C E NO. 10607 AN ORDINANCE, appropriating Two Hundred Fifteen Thousand Dollars ($215,000.00) from the Sanitary Replacement Fund to reimburse Triple Crown Properties II, L.L.C. and Taylor Morley, Inc. for a portion of the cost to construct approximately 1,680 feet of 18-inch diameter sanitary relief sewer located south of Olive Boulevard between Woods Mill Road and Fernview Drive, in the City of Creve Coeur, Missouri, as a replacement for the existing inadequate 8-inch diameter sanitary sewer; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Triple Crown Properties II, L.L.C. and Taylor Morley, Inc. for the aforesaid construction. WHEREAS, the District=s Engineering Department has identified a sanitary relief project to upgrade an existing inadequate sanitary sewer (CC-02, Fernview and Olive Sanitary Relief, MSD Project Number 90009), and WHEREAS, the District=s Engineering Department has determined that the existing 8-inch diameter sanitary sewer does not have sufficient capacity to accept the additional flow from the proposed developments of Mill Crossing (P-21955), owned by Triple Crown Properties II, L.L.C. and Bellerive Farm Estates (P-22564), owned by Taylor Morley, Inc., and WHEREAS, Triple Crown Properties II, L.L.C. and Taylor Morley, Inc. are desirous of completing the construction of approximately 1,680 feet of the downstream replacement sewer (Mill Crossing Offsite Sewer, P-23044) in a time more immediate than the MSD construction schedule, and WHEREAS, Triple Crown Properties II, L.L.C. and Taylor Morley, Inc. have agreed to undertake the construction of the aforesaid 1,680 feet of sewer and share in the cost of the design and construction of said relief sewer, and WHEREAS, the funds for the upgrade of the sanitary sewer was included in the 1999-2000 Capital Improvement and Replacement Program, and WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Two Hundred Fifteen Thousand Dollars ($215,000.00) is hereby appropriated from the Sanitary Replacement Fund to reimburse Triple Crown Properties II, L.L.C. and Taylor Morley, Inc. for a portion of the cost to construct approximately 1,680 feet of 18-inch diameter sanitary relief sewer located south of Olive Boulevard between Woods Mill Road and Fernview Drive, in the City of Creve Coeur, Missouri, as a replacement for the existing inadequate 8-inch diameter sanitary sewer. Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Triple Crown Properties II, L.L.C. and Taylor Morley, Inc. whereby Triple Crown Properties II, L.L.C. and Taylor Morley, Inc. will construct approximately 1,680 feet of 18-inch diameter sanitary relief sewer located south of Olive Boulevard 3 between Woods Mill Road and Fernview Drive, in the City of Creve Coeur, Missouri, as a replacement for the existing inadequate 8-inch diameter sanitary sewer; said contact to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriate ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted August 5, 1999 by the following vote – Ayes – G.J. Sheffield, C.D. Seward, J.W. Siscel, and M.C. Williams. Nays – None. Secretary-Treasurer