HomeMy Public PortalAbout10614 O R D I N A N C E NO. 10614
AN ORDINANCE, appropriating Eighty-five Thousand Dollars
($85,000.00) from the Operation, Maintenance and Construction Improvement Fund of
Creve Coeur-Frontenac for engineering services for the final design of Alden-
Middlebrook-Sherwyn Storm Channel (99078); and authorizing the Executive Director
and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to
enter into Contract E-911 with Zambrana Engineering, Inc. for the aforesaid
engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Eighty-five Thousand Dollars ($85,000.00) is
hereby appropriated from the Operation, Maintenance and Construction Improvement
Fund of Creve Coeur-Frontenac for engineering services for the final design of Alden-
Middlebrook-Sherwyn Storm Channel (99078).
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into
Contract E-911 with Zambrana Engineering, Inc. for engineering services for the final
design of Alden-Middlebrook-Sherwyn Storm Channel (99078); said contract to be
comprised of such terms and conditions as are approved by the office of the General
Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance, shall
take effect immediately upon its enactment.
The foregoing Ordinance was adopted September 9, 1999 by the following vote –
Ayes – C.L. Barnhart, G.J. Sheffield, C.D. Seward, P.P. Finn, and M.C. Williams.
Nays – None.
Secretary-Treasurer