Loading...
HomeMy Public PortalAbout10634 O R D I N A N C E NO. 10634 AN ORDINANCE, appropriating a total of Nine Hundred Seventy-five Thousand Dollars ($975,000.00), to be funded as follows: Five Hundred Sixty-five Thousand Dollars ($565,000.00) from the Operation, Maintenance and Construction Improvement Fund of Maline Creek, and Four Hundred Ten Thousand Dollars ($410,000.00) from the Improvement Fund, to be used for project costs for the construction of cellular concrete block mat channel lining, sheet pile cutoff walls, and appurtenances in Maline Creek Bank Stabilization (98059), in the City of Bellefontaine Neighbors, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Gershenson Construction Company, Inc. for the construction of the aforesaid construction. WHEREAS, the bid for the construction of said cellular concrete block mat channel lining, sheet pile cutoff walls, and appurtenances is Nine Hundred Twenty- eight Thousand Seven Hundred Eighty-seven and 30/100 Dollars ($928,787.30), and the allowance for construction change orders is Forty-six Thousand Two Hundred Twelve and 70/100 Dollars ($46,212.70), and WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The total sum of Nine Hundred Seventy-five Thousand Dollars ($975,000.00) to be funded as follows: Five Hundred Sixty-five Thousand Dollars ($565,000.00) from the Operation, Maintenance and Construction Improvement Fund of Maline Creek, and Four Hundred Ten Thousand Dollars ($410,000.00) from the Improvement Fund, is hereby appropriated to be used for project costs for the construction of cellular concrete block mat channel lining, sheet pile cutoff walls, and appurtenances in Maline Creek Bank Stabilization (98059), in the City of Bellefontaine Neighbors, Missouri. Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Gershenson Construction Company, Inc. as the lowest responsible bidder for the construction of cellular concrete block mat channel lining, sheet pile cutoff walls, and appurtenances in Maline Creek Bank Stabilization (98059), in the City of Bellefontaine Neighbors, Missouri, pursuant to bids received and opened on the 23rd day of August, 1999. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted October 14, 1999 by the following vote – Ayes – C.L. Barnhart, P.P. Finn, C.D. Seward, J.W. Siscel, and M.C. Williams. Nays – None. Secretary-Treasurer