HomeMy Public PortalAbout10661 O R D I N A N C E NO. 10661
AN ORDINANCE, appropriating One Hundred Sixty-six Thousand Dollars
($166,000.00) from the Sanitary Replacement Fund for engineering services for the final
design of Upper Coldwater Creek Sanitary Relief Sec. E Phase III (99106); and authorizing
the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis
Sewer District to enter into Contract E-927 with CDG Engineers, Inc. for the aforesaid
engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation authorized
herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of One Hundred Sixty-six Thousand Dollars
($166,000.00) is hereby appropriated from the Sanitary Replacement Fund for engineering
services for the final design of Upper Coldwater Creek Sanitary Relief Sec. E Phase III
(99106).
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-
927 with CDG Engineers, Inc. for engineering services for the final design of Upper
Coldwater Creek Sanitary Relief Sec. E Phase III (99106); said contract to be comprised of
such terms and conditions as are approved by the office of the General Counsel of the
District.
Section Three. This ordinance, being an appropriation ordinance, shall take
effect immediately upon its enactment.
The foregoing Ordinance was adopted December 9, 1999 by the following vote –
Ayes – C.L. Barnhart, G. J. Sheffield, C.D. Seward, J.W. Siscel, and P.P. Finn.
Nays – None
Secretary-Treasurer