HomeMy Public PortalAbout10679 O R D I N A N C E NO. 10679
AN ORDINANCE, appropriating Forty-one Thousand Dollars
($41,000.00) from the Sanitary Replacement Fund for engineering services for the final
design of Five Oaks Pump Station P-423 (Infrastructure Repair) (99119); and
authorizing the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into Contract E-931 with The Benham
Group, Inc. for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Forty-one Thousand Dollars ($41,000.00) is
hereby appropriated from the Sanitary Replacement Fund for engineering services for
the final design of Five Oaks Pump Station P-423 (Infrastructure Repair) (99119).
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into
Contract E-931 with The Benham Group, Inc. for engineering services for the final
design of Five Oaks Pump Station P-423 (Infrastructure Repair) (99119); said contract
to be comprised of such terms and conditions as are approved by the office of the
General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance, shall
take effect immediately upon its enactment.
The foregoing Ordinance was adopted January 6, 2000 by the following vote –
Ayes – C.L. Barnhart, C.D. Sewrd, G. J. Sheffield, and P.P. Finn.
Nays – None.
Secretary-Treasurer